BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 23, 2025 at 8:00 PM

Updated October 24, 2025

Renovation of an educational facility in Reno, Nevada. Completed plans call for the renovation of a educational facility.

PWP #: WA-2026-021 Replace two (2) scoreboards in the Large Gym and one (1) scoreboard in the Small Gym. Question Deadline 10/02/2025 at 4:30 PM PT All questions shall be submitted in writing directly to WCSDs Solicitations website or via e-mail to solicitations@washoeschools.net During this active solicitation there shall be no personal contact with any WCSD employees or other parties associated with this project directly. All inquiries shall be done in writing as stated above The work shall include the furnishing of all labor, tools, equipment, material, transportation and the performance of all operations required for the Replacement of Gym Scoreboards at North Valleys High School at the site(s) and associated work as specified herein and shall include the cleanup and removal from the site(s) of all debris resulting from the operations performed. It shall also be the Contractor's responsibility to take all necessary safety precautions and to furnish barricades and/or other safety measures as required. All work shall be performed in strict accordance with the requirements of these specifications and any and all appropriate state, county and local ordinances. II. LOCATION OF THE WORK: The location(s) of the work and contact person(s) are: North Valleys High School 1470 E. Golden Vally Road Reno, NV 89506 Phone #: 775-677-5499 Principal: Tomas Macaluso Site Facilities Coordinator: Sonia Monarrez The Contractor is urged to examine the site(s) and compare the existing conditions with that of the work outlined. No extra payment will be considered for work additional to that shown or noted if such work would have been apparent in an inspection of the premises. To review the existing premises, contact the Principal and/or Site Facilities Coordinator at the site(s). Whenever at the site, be sure to check in at the front office. At the above-named site(s), school classes and other construction projects may or may not be taking place during the construction phase. It will require coordination between the school site(s), other vendors, and the WCSD's Capital Projects Department. Range Low $85,950.00 High $105,050.00 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Educational

$81,200.00

Public - County

Renovation

3

18

3

9

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
20
Active Projects
0
Bidding Soon
240
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 13, 2025

November 12, 2025

Project location map

1470 E Golden Valley Rd, Reno, NV

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.