Renovation of an educational facility in Hawthorne, New York. Completed plans call for the renovation of a educational facility.

Capital Project, which includes: All work will take place at Linden Hill High School and Cedar Knolls Academy, involving the removal of existing roof-mounted chillers and dust collectors, followed by restoration of affected building envelope areas. New ground-mounted chillers will be installed, including concrete pads, fencing, and interior modifications to support the updated systems. Each bid shall be submitted on a stipulated sum basis for the following contracts: CONTRACTS Contract No. 01 General Construction Work Prime Contract (GC) Bidders must comply with New York State Department of Labor Prevailing Wage Rate Schedule and conditions of employment. Bidder must provide Bid Security in the amount and form, per the terms indicated in Section Instructions to Bidders. A full performance bond, together with labor and material payment bonds in form acceptable to Owner shall be required of the successful Bidder for the full contract amount. The Hawthorne Cedar Knolls Union Free School District reserves the right to waive any informalities or irregularities in the Bids received, and/ or to reject all Bids without explanation. This project is being delivered under a Multiple Prime Contract, which includes General Construction, Mechanical Construction, and Electrical Construction. The scope of work involves: Removal of the existing roof-mounted chiller Removal of the roof-mounted dust collection system Patching and repair of the roof deck and exterior walls Installation of new roofing Installation of an owner-provided ground-mounted chiller Cedar Knolls Academy (CKA) 66-08-03-02-0-018-003 - 226 LINDA AVENUE HAWTHORNE, NY 10532 Linden Hill High School (LHHS) 66-08-03-02-0-016-002 Question Deadline 10/03/2025 No interpretation of the meaning of the Contract Documents, the existing conditions, or of the scope of Work will be made verbally. Provide every request for such interpretation in writing, addressed to CSArch, Attention: Patricia Turner, 19 Front Street, Newburgh, NY 12550-7601, by e-mail: pturner@csarchpc.com, with the subject line to read " School District Bid Question" and to be given consideration must be received at least seven (7) business days prior to the date of the Bid Opening. Project Site Superintendent: GC shall provide one (1) full time Project Site Superintendent while any work related to this Contract is being performed on site. Superintendent may be a working Foreman as long as the daily requirements of this Contract are maintained, as they relate to the Construction Documents and the Project Schedule. Superintendent shall work closely with the other Prime Contract Superintendents and Foremen, in a manner that best promotes the Project Master Schedules and the objectives of the Project. 1. Superintendent shall be on site while Prime Contractor's own forces, and/or their sub-contractors forces, are on site; also, while other Prime Contracts are installing work, or require coordination of work, related to this Contract, and/or as requested by the district. 2. Superintendent shall be the same individual throughout the Project. 3. Project Site Superintendent shall be an individual with minimum of five (5) years' experience in this field of work. 4. Refer to Section 013100 "Project Management and Coordination" for further requirements. 5. Project Site Field Office: Provide site office facilities for this Contract's Project Superintendent. Site Office shall be equipped with telephone w/answering machine, fax, and e-mail. Contact information shall be provided to the district. a. The Owner reserves the right to seek reimbursement for temporary facilities not provided by this Prime Contract. 2) Project Foreman: GC shall provide at least one (1) full time Project Foreman during each shift of Work at each school; Foreman shall be able to make binding decisions, as they relate to the daily activities of their crew, as related to achieving the goals of the Project. 3) Site Communications: GC provide Project Superintendent with a mobile phone, all costs and service charges paid for by GC; provide the district with contact number(s). 4) Project Site Field Office: Provide site office facilities for this Contract's Project Superintendent. Site Office shall be equipped with telephone w/answering machine, fax, and e-mail. Contact information shall be provided to the Owner's Site Representative. 1. Each GC Prime Contractor shall provide and install adequate protection to adjacent areas of construction work. a. Each Prime Contractor, including GC Prime shall conform to phasing and sequencing of site work as shown on phasing drawings. Any deviation shall be clearly indicated and defined in the bid proposal. See the preliminary milestone schedule. coordinated with the district. See Milestone Schedule. Award Contract: November 3, 2025 Start of Construction Work: November 10, 2025. Substantial Completion: April 29, 2026. Project Closeout: May 30, 2026.

Bid Results

Educational

$369,300.00

Public - City

Renovation

55

21

15

5

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
915
Active Projects
442
Bidding Soon
7,141
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 14, 2025

November 10, 2025

Project location map

Multiple Locations, Hawthorne, NY

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.