Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 26, 2026 at 8:00 PM
Updated May 29, 2026
Renovation of an educational facility in Storrs Mansfield, Connecticut. Completed plans call for the renovation of a educational facility.
RFI 5/08/2026 2:00 PM All RequestsforInformation ("RFI") questions are to be posted online. No phone calls or RFI questions emailed directly to the Procurement Agent will be accepted. PROJECT SCHEDULE/DURATION: Anticipated Contract Issuance/Notice to Proceed: 6/30/2026 Construction is planned to start: 7/6/2026 Substantial Completion: 8/21/2026 LIQUIDATED DAMAGES: Liquidated Damages of Five Hundred Dollars and 00/100 ($500.00) per calendar day shall be assessed if the Contractor fails to achieve Substantial Completion or causes delay to the Substantial Completion of any portion of the work within the Contract Time. WAGE RATES: Prevailing Wages are required for this Project if the total cost of all work to be performed by the Contractor and Subcontractors is $100,000.00 or more and subject to Connecticut General Statutes 31-53, 31-54, and 31-55 SBE/MBE PARTICIPATION: The University of Connecticut is committed to providing a professionally inclusive environment within which small and minority businesses are encouraged to participate in the procurement experience. As such, we encourage participation by Small (SBE) businesses, Minority-Owned (MBE) businesses, Woman-Owned (WBE) businesses, and businesses owned by persons with a disability (DisBE), certified as such by the Connecticut's Department of Administrative Services Supplier Diversity Division. For further information. PROJECT DESCRIPTION/SCOPE OF WORK: This project involves hazardous material abatement and reglazing of Greenhouse 3 (GH-3) at Torrey Life Sciences at the University of Connecticut. Work includes removal of all single pane glazing and compression brackets (roof only), cleaning of glass and framing, and reinstallation using approved primer and structural silicone sealant systems. Adhesion testing will be performed per ASTMC1521. Scope also includes removal and off-site disposal of approximately 5,500 linear feet of asbestos- and PCB-containing glazing compounds associated with 1,652 glass panes. COST PROPOSAL: Submit a Cost Proposal utilizing the Form provided. No substitution of the Form is permitted. FINANCIAL ABILITY: The lowest responsible Bidder will be required to submit their Company's financial documents within 5 business days of notification from the University. The financial documents must demonstrate the Company's ability to complete a construction project with a minimum value of at least $400,000. See the Financial Ability Prequalification Requirements Document for further information. LIQUIDATED DAMAGES: Liquidated Damages of Five Hundred Dollars and 00/100 ($500.00) per calendar day shall be assessed if the Contractor fails to achieve Substantial Completion or causes delay to the Substantial Completion of any portion of the work within the Contract Time.
Post-Bid
Educational
$472,000.00
Public - State/Provincial
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 28, 2026
July 6, 2026
75 N Eagleville Rd, Storrs Mansfield, CT
Related To This Project
Storrs Mansfield, CT
Bid Date: Oct 22 2025
Storrs Mansfield, CT
Bid Date: Sep 30 2025
Storrs Mansfield, CT
--
Storrs Mansfield, CT
Bid Date: Sep 25 2025
Storrs Mansfield, CT
Bid Date: Dec 03 2025
Storrs Mansfield, CT
Bid Date: Nov 20 2025
Storrs Mansfield, CT
Bid Date: Nov 10 2025
Storrs Mansfield, CT
--
Storrs Mansfield, CT
Bid Date: Dec 09 2025
Storrs Mansfield, CT
Bid Date: Sep 16 2025
Storrs Mansfield, CT
Bid Date: Sep 23 2025
Storrs Mansfield, CT
Bid Date: Oct 01 2025
Storrs Mansfield, CT
Bid Date: Sep 11 2025
Storrs Mansfield, CT
Bid Date: Sep 26 2025
Storrs Mansfield, CT
Bid Date: Sep 16 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
