BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 16, 2025 at 8:00 PM

Updated September 17, 2025

Site work and paving for a sidewalk / parking lot in Logan, Ohio. Conceptual plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

HOC-Hocking Valley Scenic PID No. 123021 County of Hocking Technical or scope of services questions specific to the project or RFP requirements. The services include preparation of construction contract plans for Phase 1 of the Hocking Valley Scenic Shared Use Path project in Hocking County with a project length of approximately 1.25 miles. This project will primarily be the construction of an ADA-compliant Shared Use Path to link Logans Aqueduct Park to Logan-Hocking Middle School. The project will be constructed with safety funding and TAP funding and is slated for FY 2027. If budget allows, the path may extend beyond the Middle School towards either Logan-Hocking High School, or in a southeasterly direction towards a future connection to the Hockhocking Adena Bikeway. Estimated Construction Cost: $2,500,000.00 Prequalification Requirements for This Agreement Are Listed Below. For All Prequalification Categories Other Than Financial Management System Evaluation the Requirement May Be Met by the Prime Consultant or a Subconsultant. Also, Please Note That Only Individuals (Not Firms) Are Prequalified for Right of Way Acquisition Services. In Instances Where Prequalification for These Services is Required, a Prequalified Individual, Either Employed by the Prime Consultant or a Subconsultant, Must Be Named in Order To Meet the Requirement. For Agreements That Require Prequalification in Financial Management System Evaluation, the Prime Consultant and All Subconsultants That Provide Engineering and Design Related Services Must Be Prequalified in This Category. It is anticipated that the selected Consultant will be authorized to proceed by 12/01/2025. The plans are to be completed and on file with Hocking County within twelve (12) months from the date of authorization. The specific plan file date as well as Stage 1, Stage 2 and Stage 3 submittal dates will be finalized prior to consultant authorization to proceed. Disadvantaged Business Enterprise (DBE) Participation Goal None The method of contractor selection has not been determined at this time. OHDOT - RFP Engineering - Phase 1 of the Hocking Valley Scenic Shared Use Path Project in Hocking County

Conceptual

Sidewalks / Parking Lot

$2,500,000.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
134
Active Projects
21
Bidding Soon
1,149
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 1, 2025

Project location map

Multiple Locations, Logan, OH


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.