Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 7, 2025 at 8:00 PM
Updated October 8, 2025
Renovation of a residential development in Baltimore, Maryland. Completed plans call for the renovation of a residential development.
The Contractor shall supply all labor, material, supervision, equipment, insurance, permits including U&O (Unit of Occupancy Permit) and all other incidentals required to complete the work items listed below as requested by HABC, in accordance with all applicable federal, state and local regulations. Fix completion date of 30 days upon NTP date. The Contractor shall supply all labor, material, supervision, equipment, insurance, permits including U&O (Unit of Occupancy Permit) and all other incidentals required to complete the work items listed below as requested by HABC, in accordance with all applicable federal, state and local regulations. 1404 Mountmor Ct General: 1. Remove and properly dispose of all Trash, Furniture and Miscellaneous Items in the Unit. 2. Replace closet shelving/closet rod as necessary 3. Final Cleaning of Entire Unit to Make Ready for Occupancy. Bathrooms: 1. Remove existing sink, supply and install new Vanity Cabinet w/ Vanity Bowl, faucet and stainless steel 1-1/4" drain line. 2. Clean existing toilet and replace round toilet seat 3. Remove existing, supply and install New Medicine Cabinet with Mirror 4. Remove existing, supply and install all new bathroom Accessories, Non-UFAS 5. Remove existing shower, tub faucet, tub spout and showerhead, supply and install new shower wall tub faucet, tub spout and showerhead 6. Remove existing shower rod, supply and install new shower rod 7. Remove existing (1) 6 panel doors. Supply and install (1) 6 panel doors Kitchen: 1. Remove existing rangehood, supply and install Broan #4100 range hood (Black) 2. Remove existing kitchen cabinets, Supply and Install HUD severe use base and wall cabinets "Honey'" 3. Remove existing countertop, supply and install new countertops. 4. Remove existing kitchen faucet, supply and install new Delta faucet 5. Remove existing kitchen sink drain line, supply and install new stainless steel 1-1/2" (inch) drain line. 6. Remove existing, supply and install laundry hookup box and hot /cold water valves. Bedroom # 1: 1. Remove existing vertical window blinds, supply and install new vertical window blinds (2)2. Clean exterior and interior of heating convector of any debris. 3. Clean window frame including sills and wells (Lead Testing) and window glass. 4. Paint existing Closet shelf and pole. 5. Remove existing (2) 6 panel doors. Supply and install (2) 6 panel doors Bedroom # 2: 1. Remove existing window blinds, supply and install new window blinds (2)2. Clean exterior and interior of heating convector of any debris. 3. Clean window frame including sills and wells (Lead Testing) and window glass 4. Paint existing closet shelf and pole. 5. Remove existing (2) 6 panel doors. Supply and install (2) 6 panel doors Livingroom: 1. Remove existing window blinds, supply and install new window blinds (2) 2. Clean window frame including sills and wells (Lead Testing) and window glass 3. Remove existing receptacle covers, supply and install new receptacle covers 4. Clean exterior and interior of heating convector of any debris. 5. Clean window frame including sills and wells (Lead Testing) and window glass 6. Paint existing closet shelf and pole. 7. Remove existing (1) 6 panel doors. Supply and install (1) 6 panel door 8. Remove existing fire door, supply and install new fire door. Mechanical / Plumbing: 1. Check and Inspect Gas Distribution (Stove) for service and repair any leaks. 2. Water Distribution (Bathroom & Kitchen) for leaks, repair leaks throughout whole unit 3. Inspect and Repair (if necessary) Drain, Water & Vent (Bathroom and Kitchen, toilets) Electrical: 1. Remove existing cover plates, supply and install all Switches / Receptacles and metal cover plates. 2. Remove existing raceways, supply and install new raceways throughout entire unit 2. Check Electric Service Panel for Gaps/Missing Breakers/Doors. 3. Remove existing light fixtures, supply and install LED integrated light fixtures in common areas, kitchen, living room and bathroom. 4. Install 10 yr. sealed smoke detectors in every bedroom 5. Install combination smoke / carbon monoxide detectors on 1 st and 2 nd Floor common areas 1619 Booker Ct General: 1. Remove and properly dispose of all Trash, Furniture and Miscellaneous Items in the Unit. 2. Replace closet shelving/closet rod as necessary 3. Final Cleaning of Entire Unit to Make Ready for Occupancy. Bathrooms: 1. Remove existing sink, supply and install new Vanity Cabinet w/ Vanity Bowl, faucet and stainless steel 1-1/4” drain line. 2. Clean existing toilet and replace round toilet seat 3. Remove existing, supply and install New Medicine Cabinet with Mirror 4. Remove existing, supply and install all new bathroom Accessories, Non-UFAS 5. Remove existing shower, tub faucet, tub spout and showerhead, supply and install new shower wall tub faucet, tub spout and showerhead 6. Remove existing shower rod, supply and install new shower rod 7. Remove existing (1) 6 panel doors. Supply and install (1) 6 panel doors Kitchen: 1. Remove existing rangehood, supply and install Broan #4100 range hood (Black) 2. Remove existing kitchen cabinets, Supply and Install HUD severe use base and wall cabinets “ Honey” 3. Remove existing countertop, supply and install new countertops. 4. Remove existing kitchen faucet, supply and install new Delta faucet 5. Remove existing kitchen sink drain line, supply and install new stainless steel 1-1/2” (inch) drain line. Bedroom # 1: 1. Remove existing vertical window blinds, supply and install new vertical window blinds (2) 2. Clean exterior and interior of heating convector of any debris. 3. Clean window frame including sills and wells (Lead Testing) and window glass. 4. Paint existing Closet shelf and pole. 5. Remove existing (2) 6 panel doors. Supply and install (2) 6 panel doors Bedroom # 2: 1. Remove existing window blinds, supply and install new window blinds (2) 2. Remove existing receptacle covers, supply and install new receptacle covers5. Paint existing closet shelf and pole. 6. Remove existing (2) 6 panel doors. Supply and install (2) 6 panel doors Bedroom # 3 1. Remove existing vertical window blinds, supply and install new vertical window blinds (2) 2. Clean exterior and interior of heating convector of any debris. 3. Clean window frame including sills and wells (Lead Testing) and window glass. 4. Paint existing Closet shelf and pole. 5. Remove existing (2) 6 panel doors. Supply and install (2) 6 panel doors Livingroom: 1. Remove existing window blinds, supply and install new window blinds (2) 2. Clean window frame including sills and wells (Lead Testing) and window glass 3. Remove existing receptacle covers, supply and install new receptacle covers 4. Clean exterior and interior of heating convector of any debris. 5. Clean window frame including sills and wells (Lead Testing) and window glass 6. Paint existing closet shelf and pole. 7. Remove existing (1) 6 panel doors. Supply and install (1) 6 panel door 8. Remove existing fire door, supply and install new fire door. Mechanical / Plumbing: 1. Check and Inspect Gas Distribution (Stove) for service and repair any leaks. 2. Water Distribution (Bathroom & Kitchen) for leaks, repair leaks throughout whole unit3. Inspect and Repair (if necessary) Drain, Water & Vent (Bathroom and Kitchen, toilets) 4. Remove existing, supply and install laundry hookup box and hot/cold water valves. Electrical: 1. Remove existing cover plates, supply and install all Switches / Receptacles and metal cover plates. 2. Remove existing raceways, supply and install new raceways throughout entire unit 2. Check Electric Service Panel for Gaps/Missing Breakers/Doors. 3. Remove existing light fixtures, supply and install LED integrated light fixtures in common areas, kitchen, living room and bathroom. 4. Install 10 yr. sealed smoke detectors in every bedroom 5. Install combination smoke / carbon monoxide detectors on 1 st and 2 nd Floor common areas Painting/Drywall Repair: 1. Supply all materials to Paint the Entire Units to Include: o Walls and ceilings shall be painted with two finish coats eggshell latex. o Kitchen and bathroom walls & ceilings, and all doors, shall receive a semi-gloss final finish coat. o Paint existing handrails on 1 st and 2 nd level stairways o Exterior door and frame, porch front and steps and exterior railing shall be painted including adjacent units within 75 feet radius. (Lead Testing)
Bid Results
Residential Subdivision
$34,800.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 30, 2025
October 30, 2025
Multiple Locations, Baltimore, MD
Related To This Project
Baltimore, MD
Bid Date: Oct 03 2025
Baltimore, MD
Bid Date: Dec 17 2025
Baltimore, MD
--
Baltimore, MD
Bid Date: Sep 29 2025
Baltimore, MD
Bid Date: Oct 29 2025
Baltimore, MD
Bid Date: Oct 01 2025
Baltimore, MD
Bid Date: Aug 25 2021
Baltimore, MD
--
Baltimore, MD
Bid Date: Sep 30 2025
Baltimore, MD
Bid Date: Nov 07 2025
Baltimore, MD
Bid Date: Oct 15 2025
Baltimore, MD
Bid Date: Oct 07 2025
Baltimore, MD
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
