BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 7, 2025 at 8:00 PM

Updated October 8, 2025

Renovation of a residential development in Baltimore, Maryland. Completed plans call for the renovation of a residential development.

The Contractor shall supply all labor, material, supervision, equipment, insurance, permits including U&O (Unit of Occupancy Permit) and all other incidentals required to complete the work items listed below as requested by HABC, in accordance with all applicable federal, state and local regulations. Fix completion date of 30 days upon NTP date. The Contractor shall supply all labor, material, supervision, equipment, insurance, permits including U&O (Unit of Occupancy Permit) and all other incidentals required to complete the work items listed below as requested by HABC, in accordance with all applicable federal, state and local regulations. 1404 Mountmor Ct General: 1. Remove and properly dispose of all Trash, Furniture and Miscellaneous Items in the Unit. 2. Replace closet shelving/closet rod as necessary 3. Final Cleaning of Entire Unit to Make Ready for Occupancy. Bathrooms: 1. Remove existing sink, supply and install new Vanity Cabinet w/ Vanity Bowl, faucet and stainless steel 1-1/4" drain line. 2. Clean existing toilet and replace round toilet seat 3. Remove existing, supply and install New Medicine Cabinet with Mirror 4. Remove existing, supply and install all new bathroom Accessories, Non-UFAS 5. Remove existing shower, tub faucet, tub spout and showerhead, supply and install new shower wall tub faucet, tub spout and showerhead 6. Remove existing shower rod, supply and install new shower rod 7. Remove existing (1) 6 panel doors. Supply and install (1) 6 panel doors Kitchen: 1. Remove existing rangehood, supply and install Broan #4100 range hood (Black) 2. Remove existing kitchen cabinets, Supply and Install HUD severe use base and wall cabinets "Honey'" 3. Remove existing countertop, supply and install new countertops. 4. Remove existing kitchen faucet, supply and install new Delta faucet 5. Remove existing kitchen sink drain line, supply and install new stainless steel 1-1/2" (inch) drain line. 6. Remove existing, supply and install laundry hookup box and hot /cold water valves. Bedroom # 1: 1. Remove existing vertical window blinds, supply and install new vertical window blinds (2)2. Clean exterior and interior of heating convector of any debris. 3. Clean window frame including sills and wells (Lead Testing) and window glass. 4. Paint existing Closet shelf and pole. 5. Remove existing (2) 6 panel doors. Supply and install (2) 6 panel doors Bedroom # 2: 1. Remove existing window blinds, supply and install new window blinds (2)2. Clean exterior and interior of heating convector of any debris. 3. Clean window frame including sills and wells (Lead Testing) and window glass 4. Paint existing closet shelf and pole. 5. Remove existing (2) 6 panel doors. Supply and install (2) 6 panel doors Livingroom: 1. Remove existing window blinds, supply and install new window blinds (2) 2. Clean window frame including sills and wells (Lead Testing) and window glass 3. Remove existing receptacle covers, supply and install new receptacle covers 4. Clean exterior and interior of heating convector of any debris. 5. Clean window frame including sills and wells (Lead Testing) and window glass 6. Paint existing closet shelf and pole. 7. Remove existing (1) 6 panel doors. Supply and install (1) 6 panel door 8. Remove existing fire door, supply and install new fire door. Mechanical / Plumbing: 1. Check and Inspect Gas Distribution (Stove) for service and repair any leaks. 2. Water Distribution (Bathroom & Kitchen) for leaks, repair leaks throughout whole unit 3. Inspect and Repair (if necessary) Drain, Water & Vent (Bathroom and Kitchen, toilets) Electrical: 1. Remove existing cover plates, supply and install all Switches / Receptacles and metal cover plates. 2. Remove existing raceways, supply and install new raceways throughout entire unit 2. Check Electric Service Panel for Gaps/Missing Breakers/Doors. 3. Remove existing light fixtures, supply and install LED integrated light fixtures in common areas, kitchen, living room and bathroom. 4. Install 10 yr. sealed smoke detectors in every bedroom 5. Install combination smoke / carbon monoxide detectors on 1 st and 2 nd Floor common areas 1619 Booker Ct General: 1. Remove and properly dispose of all Trash, Furniture and Miscellaneous Items in the Unit. 2. Replace closet shelving/closet rod as necessary 3. Final Cleaning of Entire Unit to Make Ready for Occupancy. Bathrooms: 1. Remove existing sink, supply and install new Vanity Cabinet w/ Vanity Bowl, faucet and stainless steel 1-1/4” drain line. 2. Clean existing toilet and replace round toilet seat 3. Remove existing, supply and install New Medicine Cabinet with Mirror 4. Remove existing, supply and install all new bathroom Accessories, Non-UFAS 5. Remove existing shower, tub faucet, tub spout and showerhead, supply and install new shower wall tub faucet, tub spout and showerhead 6. Remove existing shower rod, supply and install new shower rod 7. Remove existing (1) 6 panel doors. Supply and install (1) 6 panel doors Kitchen: 1. Remove existing rangehood, supply and install Broan #4100 range hood (Black) 2. Remove existing kitchen cabinets, Supply and Install HUD severe use base and wall cabinets “ Honey” 3. Remove existing countertop, supply and install new countertops. 4. Remove existing kitchen faucet, supply and install new Delta faucet 5. Remove existing kitchen sink drain line, supply and install new stainless steel 1-1/2” (inch) drain line. Bedroom # 1: 1. Remove existing vertical window blinds, supply and install new vertical window blinds (2) 2. Clean exterior and interior of heating convector of any debris. 3. Clean window frame including sills and wells (Lead Testing) and window glass. 4. Paint existing Closet shelf and pole. 5. Remove existing (2) 6 panel doors. Supply and install (2) 6 panel doors Bedroom # 2: 1. Remove existing window blinds, supply and install new window blinds (2) 2. Remove existing receptacle covers, supply and install new receptacle covers5. Paint existing closet shelf and pole. 6. Remove existing (2) 6 panel doors. Supply and install (2) 6 panel doors Bedroom # 3 1. Remove existing vertical window blinds, supply and install new vertical window blinds (2) 2. Clean exterior and interior of heating convector of any debris. 3. Clean window frame including sills and wells (Lead Testing) and window glass. 4. Paint existing Closet shelf and pole. 5. Remove existing (2) 6 panel doors. Supply and install (2) 6 panel doors Livingroom: 1. Remove existing window blinds, supply and install new window blinds (2) 2. Clean window frame including sills and wells (Lead Testing) and window glass 3. Remove existing receptacle covers, supply and install new receptacle covers 4. Clean exterior and interior of heating convector of any debris. 5. Clean window frame including sills and wells (Lead Testing) and window glass 6. Paint existing closet shelf and pole. 7. Remove existing (1) 6 panel doors. Supply and install (1) 6 panel door 8. Remove existing fire door, supply and install new fire door. Mechanical / Plumbing: 1. Check and Inspect Gas Distribution (Stove) for service and repair any leaks. 2. Water Distribution (Bathroom & Kitchen) for leaks, repair leaks throughout whole unit3. Inspect and Repair (if necessary) Drain, Water & Vent (Bathroom and Kitchen, toilets) 4. Remove existing, supply and install laundry hookup box and hot/cold water valves. Electrical: 1. Remove existing cover plates, supply and install all Switches / Receptacles and metal cover plates. 2. Remove existing raceways, supply and install new raceways throughout entire unit 2. Check Electric Service Panel for Gaps/Missing Breakers/Doors. 3. Remove existing light fixtures, supply and install LED integrated light fixtures in common areas, kitchen, living room and bathroom. 4. Install 10 yr. sealed smoke detectors in every bedroom 5. Install combination smoke / carbon monoxide detectors on 1 st and 2 nd Floor common areas Painting/Drywall Repair: 1. Supply all materials to Paint the Entire Units to Include: o Walls and ceilings shall be painted with two finish coats eggshell latex. o Kitchen and bathroom walls & ceilings, and all doors, shall receive a semi-gloss final finish coat. o Paint existing handrails on 1 st and 2 nd level stairways o Exterior door and frame, porch front and steps and exterior railing shall be painted including adjacent units within 75 feet radius. (Lead Testing)

Bid Results

Residential Subdivision

$34,800.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
160
Active Projects
7
Bidding Soon
2,285
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 30, 2025

October 30, 2025

Project location map

Multiple Locations, Baltimore, MD

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.