BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 20, 2025 at 7:00 PM

Updated November 21, 2025

Site work for a playground / park / athletic field in Fuquay Varina, North Carolina. Conceptual plans call for site work for a playground / park / athletic field.

As of November 20, 2025, this project is still in the conceptual phase. A design firm should be selected in January. A timeline for construction has not yet been established. *Previous solicitation listed below for reference:* The Town of Fuquay-Varina Board of Commissioners has authorized funding for the master planning and design of Willow Springs Park to be constructed at 7069 Kennebec Rd (PIN 0677907665). The Town of Fuquay-Varina will use this Request for Qualifications (RFQ) to select a qualified architectural/engineering firm to provide the architectural and engineering services required to begin construction of Willow Springs Park through the Parks, Recreation & Cultural Resources Department. Professional services being requested include development of a park master plan, a project schedule, estimation of construction costs, schematic designs and renderings which reflect the allocated budget and Town priorities for the facility, all preliminary through construction drawings and specifications preparation, preparation of bidding documents and construction administration. This work will serve as the basis for key decisions about final design, bidding, construction funding, and the timing of construction. The Town of Fuquay-Varina proposes to retain a highly qualified, capable firm, to act as the architect in the engineering of the project, for a fixed price. The Town requests qualifications from architects, engineers, landscape architects or combinations interested in preparing a construction plan that includes engineered documents, and cost estimates for the construction of Willow Springs Park. Within this document, and subsequent actions, the Town may refer to firms participating in this RFQ process as "Respondents" and/or "Architects." After firm selection, the selected Architect(s) will be responsible for performing the basic architectural and engineering services that the Town will further specify during contract negotiations. The contract agreement will provide payment for phases of work completed, with options, to proceed through all phases, or to discontinue work as the circumstances may dictate. Upon selection of a Respondent, with whom negotiations will proceed, the Town and Respondent will develop a scope of work. The Town anticipates a contract which will include master planning, schematic design, production of computer-generated renderings, and cost estimation; however, the Town reserves the right to include additional project elements in the initial or subsequent professional services agreement as the Town may (in its sole discretion) deem appropriate. The Architect(s) will be required to retain, and be responsible for, all basic engineering disciplines such as mechanical, electrical, plumbing, landscape architecture, civil engineering, and structural engineering as appropriate for the scope of work negotiated. The Architect(s) must identify and select the appropriate sub-consultants; however, the Town reserves the right to approve proposed sub-consultants that will be associated with the project. The Town anticipates clearing of land, and grading, the current site to include facilities and amenities including, most, if not all, the following elements: parking, restrooms, picnic shelter, playground, walking trail or track, multiuse fields, seating, landscaping and public sewer infrastructure (including a public pump station and force main) to serve both the Willow Springs Park and Willow Springs Elementary School. The Town may open submitted packets at any time after the submission deadline. The Town will evaluate all submissions, satisfying the requirements of this RFQ, to establish which applicant's qualifications best fulfil the needs of the Town. The Town anticipates entering a contract with the selected firm to execute the proposed work. This RFQ, however, does not commit the Town to award a contract, nor pay any cost incurred by a firm in the preparation of the RFQ, or to contract for the goods and/or services offered. A selection committee will review all submitted statements of qualifications and, based on the information presented, will rank the responsive statement of qualifications, and compile a short list of agreeable firms for further consideration. Firms will be scored on the following categories: expertise (architecture) on this type of project, expertise (engineering) on this type of project, past performance on similar projects, adequate staff, schedule, contract administration capability on public funded projects, proximity/availability familiarity to Fuquay-Varina, completeness of proposal, creativity in layout and design, ability to fore. The Town will invite short-listed firms for an interview with the selection committee. The interview will consist of the firm providing a presentation (maximum of 20 minutes), followed by a question and answers period led by the selection committee. After the selection of a firm, there will be a period of negotiation between the Town and the design team to better define, elaborate upon, and finalize the firm's exact and final Scope of Work. Event Bid description: The Town will accept qualification packets Place submittals in a sealed envelope marked with: Request for Qualifications Willow Springs Park - Architectural and Engineering Services. The Town will offer prime consideration to the firm with significant and current experience in the development, design, and/or construction of public parks or recreation areas. Furthermore, the Town is under no obligation to enter any contract with any Respondent on any terms or conditions; and the Town reserves the right to negotiate with the next highest ranked vendor if the Town and vendor are unable to reach acceptable financial and contractual terms. The Town reserves the right to accept, or reject, all qualifications received as the result of this request, to negotiate with all qualified firms, or to cancel this request for qualifications if it is in the best interest of the Town to do so. The method of Contractor Selection has not been Determined at this time.

Conceptual

Playgrounds / Parks / Athletic Fields

$900,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
238
Active Projects
149
Bidding Soon
1,756
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 19, 2026

Project location map

To Be Determined, Fuquay Varina, NC


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.