BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 17, 2025 at 8:00 PM

Updated October 18, 2025

Site work for a road / highway in Cantua Creek, California. Completed plans call for site work for a road / highway.

Plant Establishment for Landscape Mitigation The Department of Transportation (Department) will receive quotes for Construction On State Highway In Fresno County Near Coalinga at Jacalitos Creek Bridge. District-County-Route-Post Mile: 06-Fre-33-11.0 Prime Contractor must have either a Class A license or an applicable Class C license. Prime Contractor must be a certified Small Business under Section 2-1.05. Department establishes no DVBE Contract goal but encourages bidders to obtain DVBE participation. Bids must be on a unit price basis. Complete the work, excluding plant establishment work, within 30 working days. Complete the work, including plant establishment work, within 1,280 working days. Complete the plant establishment work within 1,250 working days. No pre-bid meeting is scheduled for this project. Present bidders' inquiries to the District at: District 06 Construction Duty Senior Email Duty Senior: cr.bidder.questions@dot.ca.gov Questions about alleged patent ambiguity of the plans, specifications, or estimate must be asked before bid opening. After bid opening, the Department does not consider these questions as bid protests. Department will open bids under Section 2-1.43. There will be no public opening of quotes. Quotes results will not be listed on the Internet. Request quote results at: Analyst's Name: Arlena Tedder Email: arlena.tedder@dot.ca.gov Phone: (279)234-2434 Submit an RFI upon recognition of any event or question of fact arising under the Contract. The Engineer responds to the RFI within three (3) days. Proceed with the work unless otherwise ordered. You may protest the Engineer's response by: 1. Submitting a potential claim record, using the Supplemental Potential Claim Record form, within three (3) days after receiving the Engineer's response 2. Complying with Section 5-1.43

Post-Bid

Roads / Highways

$314,387.00

Public - State/Provincial

Site Work

19

7

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
130
Active Projects
64
Bidding Soon
669
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 30, 2025

October 30, 2025

Project location map

CA-33, Cantua Creek, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.