BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 22, 2025 at 8:00 PM

Updated October 23, 2025

Site work and paving for a civil project in Albuquerque, New Mexico. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Socorro Main Canal Reconstruction Phase IIB Project. The project includes earthwork; removals and fills; construction of shotcrete lined channel; preparation of maintenance roads; grading; riprap; seeding; and installation of new irrigation infrastructure including turnouts and turnout connections. The following conditions apply to prospective bidders: A. Appropriate Contracting License B. Bidders must complete and include the MRGCD CAMPAIGN CONTRIBUTION DISCLOSURE FORM with their bid. MRGCD reserves the right to reject any or all proposals and to waive any informality or technicality in any proposal. Decisions of the State Labor Commissioner setting wage rates will be a part of the Contract. The Project includes earthwork, removals and fills, construction of shotcrete lined channel, Preparation of maintenance roads, grading, riprap, seeding, and installation of new irrigation infrastructure, including turnouts and turnout connections. along with NPDES compliance. MRGCD is the contracting agency. The intent of this contract is to perform the identified work under the schedule set forth in these contract documents, as well as to establish bid items and corresponding unit prices. All Work for the Socorro Main Canal Reconstruction Phase IIB Project must be completed in One Hundred and Twenty (120) calendar days for substantial completion with a mandatory completion date of February 14 th , 2026 and One Hundred and Fifty (150) days for final completion from the Second Notice to proceed for the Socorro Main Canal Reconstruction Phase IIB Project. All contract administration, pay estimates, and change orders will be processed by MRGCD. or other Contract Documents, or finds discrepancies in or omissions from the Drawings or Specifications, they may submit to the Project Engineer, Tyler Ashton, P.E., Wilson and Company, email to Tyler.Ashton@wilsonco.com and Jure Marovich, Wilson & Company at Jure.Marovich@wilsonco.com a written request for an interpretation or correction thereof. Questions must be received by y October 1 st , 2025 to allow the Engineer time to respond LOCATION: MRGCD rights-of-way located as detailed on the vicinity map on the Construction Drawings in Socorro Main Canal Reconstruction Phase IIB Project

Award

Water / Sewer

$6,476,749.00

Public - City

Paving, Site Work

56

6

10

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
31
Active Projects
20
Bidding Soon
318
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 8, 2025

November 7, 2025

Project location map

Multiple Locations, Albuquerque, NM

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.