BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 5, 2026 at 7:00 PM

Updated February 6, 2026

Site work and paving for a mixed-use development in Brownsville, Texas. Completed plans call for paving for a sidewalk / parking lot; for site work for a water / sewer project; sidewalk / parking lot; road / highway; road / highway; and bridge / tunnel.

**As of February 4, 2026, the project was awarded to GO UNDERGROUND LLC, with an awarded amount of $4,520,229.06.** The City of Brownsville is soliciting bids for the Coffee Road Roadway, Drainage, and Utility Improvements Project. Work includes demolition, site grading, installation of storm drainage and water/wastewater utilities, roadway reconstruction, paving, striping, and associated traffic control. The Contractor shall furnish all labor, materials, equipment, supervision, and incidentals required to complete the project Question Deadline 11/11/2025 at 3:00 PM CT Work of the contract is for reconstruction of Coffee Road between Ruben M. Torres Boulevard and Paredes Line Road including the following and as noted in the Construction Drawings: a. Install hot mix asphalt concrete pavement including flexible crushed limestone base and stabilized subgrade. b. Install 24-inch, 30-inch, and 36-inch reinforced concrete pipe storm trunk lines including inlets, manholes and junction boxes. c. Install 5-foot by 5-foot precast box culverts. d. Install canasta headwall at the Hike and Bike Trail outfall. e. Install 8-inch to 12-inch diameter water lines including fire hydrants, valves and fittings. Reconnect to existing water lines, service lines and fire lines. f. Install 8-inch to 12-inch diameter wastewater lines including manholes and service line reconnections. g. Construct sidewalk and shared use path along the project limits. h. Install reflective thermoplastic pavement marking. i. Install concrete swale and pedestrian handrails. The existing and proposed facilities, dimensions and elevations shown on the plans are the Engineer's best information on the location of the existing and proposed utilities. Contractor shall field verify the existing, and proposed facilities, locations, dimensions, angles, and alignments prior to ordering materials and/or initiation of work. Any variation in the planned quantities shall be transmitted to the Engineer for approval prior to commencing work.

Award

Roads / Highways

$4,520,229.00

Public - City

Paving, Site Work

1

1

23

5

Subscribe For Documents

56 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
55
Active Projects
32
Bidding Soon
522
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 9, 2025

February 9, 2026

Project location map

Multiple Locations, Brownsville, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.