BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 16, 2025 at 8:00 PM

Updated October 17, 2025

Renovation of a swimming pool in Benson, Minnesota. Completed plans call for the renovation of a swimming pool.

o Swimming Pool Finish Replacement (plaster and paint) o Swimming Pool Minor Concrete Repair o Grating Replacement o Waterslide Refurbishment o Equipment Refurbishment . Construction Start: October 27, 2025 (pending award) B. Construction Substantial Completion: May 15, 2026 C. Construction Final Completion: May 22, 2026 Question Deadline 10/08/2025 Notify the PROJECT MANAGER of omissions, discrepancies, or ambiguities in the Bidding Documents. Submit requests for interpretation or correction in writing, to be received by the PROJECT MANAGER not later than five (5) business days before the bid opening date. Benson Family Aquatic Center Benson Park, 2345 Atlantic Ave, Benson, MN 56215 The Contractor shall construct a fully operating facility, as awarded in the base bid and alternates, according to the design documents to include this manual, the drawings and all addendums and clarifications; 1. Compliance with project safety requirements in accordance with applicable laws. 2. All temporary facilities, barricades and cover related to contractors work to include maintenance of security, safety, cleanliness and protection of materials in area. 3. On-going clean-up of work areas and removal of debris related to contractors work. 4. Mobilization and phasing of work as required by the project construction schedule. 5. Coordinate with the Owner, Construction Manager and other Contractors to comply with the Owners occupancy requirements during construction. Contractors are required to meet State and Local requirements for occupancy by area. 6. Provisions for shop drawings, submittals, samples, manufacturers installation instructions, manufacturers certificates, Owner Instruction, O & M Manuals, and warranties as outlined in the Project Specifications as applicable to the work of each contract. 7. Conformance with the Contract closeout procedure as outlined in the project specifications. 8. Hoisting, deliveries and material storage. 9. All winter or weather conditions as associated with each prime contractors scope of work as necessary to ensure completion of the project by close-out date specified.

Post-Bid

Swimming Pools

$1,000,000.00

Public - City

Renovation

8

8

4

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 15, 2025

October 27, 2025

Project location map

2345 Atlantic Ave, Benson, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.