Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 15, 2026 at 8:00 PM
Updated May 16, 2026
Site work and new construction of a bridge / tunnel in Cleveland, Ohio. Completed plans call for the construction of a bridge / tunnel; and for site work for a bridge / tunnel.
In General, the Work Shall Consist of Furnishing All Labor, Materials, Equipment, and Incidentals for Construction of the Following Work: The Bct Mainline Tunnel is Approximately 22,300 Lf of 20-ft (Finished) Diameter CSO Storage Tunnel, Excavated in Rock and Supported With a Bolted, Gasketed, One-pass Steel Fiber Reinforced Concrete Segmental Lining. Six (6) Tunnel Drop Shafts, an Overflow Tunnel, Tunnel Adits and Consolidation Sewers, Sewer Diversion & Gate Control Structures Including Associated Mechanical, Electrical and Instrumentation/control Equipment, and Other Near Surface and Ancillary Structures. The Deadline for Questions is Wednesday, June 10, 2026 at 5 P.m Official Local Time. The Northeast Ohio Regional Sewer District (Sewer District) protects public health and the environment by leading effective wastewater and stormwater management. As the largest wastewater treatment provider in the State of Ohio, the Sewer District spans 380 square miles, serves 62 communities and one million residents, treats 90 billion gallons of wastewater a year, and manages more than 400 miles of streams. In addition to its award-winning treatment plant and laboratory performance, the Sewer District's Project Clean Lake construction program will reduce annual Lake Erie pollution by 4 billion gallons by 2035, while its Regional Stormwater Management Program addresses widespread inter-community problems like flooding, pollution, and erosion. NEORSD is an Equal Opportunity Employer. We are committed to fostering a diverse and inclusive workforce, recognizing the full range of human differences and similarities. Through our unwavering efforts to leverage the potential of our diversity, we continually strive to build and foster an environment that respects each individual. We encourage and promote innovation and provide opportunities for all employees to interact, communicate, and realize the full potential of their talents. The Sbe Goal(S) for This Contract is 15%. Estimate of Probable Construction Cost for Big Creek Tunnel is $300,000,000.00. For This Project, Neorsd Will Not Award a Contract for Any Bid in Excess of Ten Percent (10%) Above the Estimate of Probable Construction Cost.
GC Bidding
Bridges / Tunnels
$300,000,000.00
Public - State/Provincial
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 25, 2026
September 1, 2026
Multiple Locations, Cleveland, OH
Related To This Project
Cleveland, OH
Bid Date: Oct 23 2025
Cleveland, OH
--
Cleveland, OH
--
Cleveland, OH
Bid Date: May 07 2026
Cleveland, OH
Bid Date: Mar 26 2026
Cleveland, OH
Bid Date: Mar 26 2026
Cleveland, OH
--
Cleveland, OH
--
Cleveland, OH
--
Cleveland, OH
Bid Date: Sep 17 2025
Cleveland, OH
Bid Date: Oct 07 2025
Cleveland, OH
Bid Date: Oct 14 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
