BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 8, 2025 at 8:00 PM

Updated October 10, 2025

This is a service / maintenance or supply contract in Fresno, California. Contact the soliciting agency for additional information.

Basis of Bid: The County intends to award a contract to each of the four (4) lowest responsible bidders. One proposal must be submitted by each bidder wishing to bid for one of the four (4) contracts in the Class B license category. Bids will be compared, for purposes of identifying the apparent low bidder for proposed award of the contract, on the basis of the Award Criteria Figure. The Award Criteria Figure is the sum of the weighted Adjustment Factors. Bidders will submit one bid that will be considered for four (4) potential contracts being offered. Bidders will bid two sets of Adjustment Factors to be applied to the Unit Prices. One set of Adjustment Factors will be for projects located in general facilities, and one set of Adjustment Factors for projects located in secure facilities. Each set of Adjustment Factors will include one Adjustment Factor for performing work during Normal Working Hours and a second Adjustment Factor for performing work during Other Than Normal Working Hours. All Adjustment Factors apply to every task in the Construction Task Catalog. A Job Order Contract is an indefinite quantity contract pursuant to which the Contractor will perform an ongoing series of individual projects at different locations throughout the County of Fresno. The bid documents include the General Conditions and a Construction Task Catalog, which contain construction tasks with preset Unit Prices. All Unit Prices are based on local labor prevailing wages, material and equipment prices and are for the direct cost of construction. Job Order Contracts: Upon award of the contract and as projects are identified, the Contractor will jointly scope the work with the County Project Manager. The County Project Manager will prepare a Detailed Scope of Work and issue a Request for Proposal to the Contractor. The Contractor will then prepare a Job Order Proposal for the project including a Job Order Price Proposal, Schedule, Sketches or Drawings, a list of subcontractors, and other requested documentation. The Job Order Price shall equal the value of the approved Job Order Price Proposal. The value of the Job Order Price Proposal shall be calculated by summing the total of the calculation for each Pre-priced Task (Unit Price x quantity x Adjustment Factor) plus the value of all Non-Pre-priced Tasks. If the Job Order Proposal is found to be complete and reasonable, a Notice to Proceed with the Job Order may be issued. The Contractor is required to complete each Detailed Scope of Work for the Job Order Price within the Job Order Completion Time. A Job Order will reference the Detailed Scope of Work and set forth the Job Order Completion Time, and the Job Order Price. The Job Order Price is determined by multiplying the preset Unit Prices by the appropriate quantities and by the appropriate Adjustment Factor. The Job Order Price shall be lump sum, fixed price for the completion of the Detailed Scope of Work. A separate Job Order will be issued for each project. Extra work, credits, and deletions will be contained in a Supplemental Work Order. The Construction Task Catalog is priced at a net value of 1.0000. The bid shall be an increase to (e.g., 1.1000) or decrease to (e.g., 0.9500) the Unit Prices listed in the Construction Task Catalog. Bidders who submit separate Adjustment Factors for separate Unit Prices will be considered nonresponsive and their bid will be rejected. The County selected The Gordian Group's (Gordian) Job Order Contracting (JOC) Solution for their JOC program. The Gordian JOC SolutionTM includes Gordian's proprietary JOC Information Management System (JOC IMS), construction cost data, and Construction Task Catalog which shall be used by the Contractor solely for the purpose of fulfilling its obligations under this Contract, including the preparation and submission of Job Order Proposals, Price Proposals, subcontractor lists, and other requirements specified by the Owner. The Contractor shall be required to execute Gordian's General Terms of Use and pay a one percent (1%) JOC System License Fee to obtain access to the Gordian JOC SolutionTM. The JOC System License Fee applies to all Job Orders issued to the Contractor under the terms of this Contract. Required Valid California Contractor's License: Class B (General Building) Question Deadline 10/02/2025 at 2:00 PM PT Requests for Clarification (RFC) Deadline & Form electronically. Bid Submission Questions: DesignServices@fresnocountyca.gov (559) 353-4919 or (559) 600-4543. All questions regarding this project shall be in writing and shall be received by the Department of Public Works and Planning (Department) electronically. Any questions received after this deadline may not receive a response. Any changes to, or clarification of, the project plans and specifications shall be in the form of a written addendum issued to planholders of record. Any oral explanation or interpretations given to this project are not binding. Contract Term: A. The Contract Term commences on the date the Contract is executed by the County of Fresno Board of Supervisors (i.e.: the effective date of the Contract). B. The term of the Job Order Contract will be either for one (1) year or when Job Orders totaling the Maximum Contract Value have been completed, whichever occurs first. All Job Orders must be issued but not necessarily completed within one (1) calendar year of the effective date of the Contract. All Job Orders for which a Notice to Proceed is issued by the County Contract Manager during the term of this Contract shall be valid and in effect notwithstanding that the Detailed Scope of Work may be performed, payments may be made, and the guarantee period may continue, after the Contract Term has expired. All terms and conditions of the Contract apply to each Job Order. No Notices to Proceed will be issued after 5:00 P.M. on the final day of the Contract Term. A mandatory pre-bid conference will be held for the purpose of discussing the Job Order Contract concept, documents, bid considerations and to discuss Job Order Contracting from a Contractor's viewpoint. Prospective bidders whose representative(s) attend the MANDATORY pre-bid conference will receive the electronic link to the official specifications, the Construction Task Catalog and the Technical Specifications. The County reserves the right, in its sole discretion, to schedule a second pre-bid conference via the issuance of an addendum to this Contract. In such case, attendance at only one of the pre-bid conferences will be mandatory. Bid Security: Bid security in the amount of $25,000 of the amount of the bid, and in the form of a bid bond issued by an admitted surety insurer licensed by the California Department of Insurance, cash, cashier's check or certified check shall accompany the bid. You must either attach an electronic bid bond or provide an original bid bond (or other form of bid security authorized by Public Contract Code section 20129(a)), prior to the bid opening. Bid security shall be made in favor of the County of Fresno. Hardcopy bid bonds shall be submitted in a sealed envelope addressed to "Department of Public Works and Planning, Office of the Design Engineer" and labeled with the name of the bidder, contract number, name of the project, and the statement "Do Not Open Until The Time Of Bid Opening - BID BOND." Each bond specified in this Notice shall be issued by a surety company designated as an admitted surety insurer in good standing with and authorized to transact business in this state by the California Department of Insurance, and acceptable to the County of Fresno. Bidders are cautioned that representations made by surety companies will be verified with the California Department of Insurance. Additionally, the County of Fresno, in its discretion, when determining the sufficiency of a proposed surety company, may require the surety company to provide additional information supported by documentation. The County generally requires such information and documentation whenever the proposed surety company has either a Best's Key Rating Guide of less than A and a financial size designation of less than VIII. Provided, however, that the County expressly reserves its right to require all information and documentation to which the County is legally entitled from any proposed surety company. Insurance: Insurance requirements for this contract are listed in Article XII of the Agreement and Section 2.40 of the General Conditions. The successful bidder shall furnish a faithful performance bond in the amount of one hundred percent (100%) of the contract amount and a payment bond in the amount of one hundred percent (100%) of the contract amount. Each bond specified in this Notice (bid bond, faithful performance bond and payment bond) shall meet the requirements of all applicable statutes, including but not limited to those specified in Public Contract Code section 20129 and Civil Code section 3248. Pursuant to Public Contract Code section 22300, substitution of securities for any moneys withheld by the County of Fresno to ensure performance under the contract shall be permitted. The Board of Supervisors reserves the right to reject any or all bids.

Post-Bid

Municipal

$6,210,000.00

Public - County

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
130
Active Projects
52
Bidding Soon
613
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 9, 2025

December 8, 2025

Project location map

Multiple Locations, Fresno, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.