BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 21, 2025 at 8:00 PM

Updated October 24, 2025

Site work for a water / sewer project in Santa Barbara, California. Completed plans call for site work for a water / sewer project.

Installation of wastewater force main, metering vault, the replacement of gravity sewer main, and related work along Via Lucero, Hope Avenue, and State Street in the City of Santa Barbara. Q&A Deadline - 10/08/2025 3:00 PM (PDT) Online Q&A Yes Bid Bond - 5.00% Payment Bond - 10.00% Performance Bond - 100.00% Bid Valid - 90 Liquidated Damages - 1,250 Estimated Bid Value - 3954000.00 Start/Delivery Date - January 2026 Project Duration - 160 working days The estimated construction cost is $4,200,000. The Project is located along Via Lucero Road, Hope Avenue, and State Street in Santa Barbara CA, and is described as follows: o Installation of a new dual fused 8-inch HDPE Via Lucero force main from the Via Lucero Lift Station located at 3960 Via Lucero to a transition manhole at Via Lucero and Hope Avenue; o Construction of a cast-in-place flow metering and control vault, and electrical and instrumentation work; o Abandonment of existing 6-inch cast iron force main; and o Replacement of a portion of the gravity sewer system downstream of the new force main, including: replacing 8-inch VCP sewer with 12-in C900 PVC in Hope Avenue, replacing 10-inch VCP sewer with 15-inch C900 PVC in State Street.

Post-Bid

Water / Sewer

$3,954,000.00

Public - City

Site Work

39

19

8

7

Subscribe For Documents

55 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
114
Active Projects
51
Bidding Soon
849
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 23, 2025

January 5, 2026

Project location map

S Hope Ave & State St, Santa Barbara, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.