Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 26, 2025 at 7:00 PM

Updated December 27, 2025

Renovation of an educational facility in Bartelso, Illinois. Completed plans call for the renovation of a educational facility.

Project description All work associated with the Electrical Switchgear Replacement work at Bartelso Elementary School. Interested party registry All Interested Parties must formally register with FGM Architects prior to Sept. 24, 2025. Total Project Budget is $150,000 - $200,000. Areas of Work a. Demolish, Provide, and Install the following: i. Refer to Exhibit A - Electrical Service Upgrade Design Criteria 3. Level of Design to be included within Proposal a. Product Data and Warranties for all proposed products b. Manufacturer Standard Technical Details for all proposed products c. Detailed Schedule of Values i. Provide line items for each product, per field ii. Include Material and Install iii. Include bond, insurance, overhead and profit d. Detailed Proposed Schedule i. Include durations of install required for each product e. Complete Sub-Contractor List 4. Design Phase a. Design-Builder shall provide a shop drawing for review to Owner and Owner's consultants for final review prior to ordering products. b. No tangible revisions are expected during this phase due to a review of the RFP and submitted information at that time. This shall serve only as a final check for compliance with the specified criteria in Exhibit A - Electrical Service Upgrade Design Criteria 5. Build Phase a. Design-Builder shall coordinate with Owner's consultants during their periodic site visits for construction observation. 6. Closeout Phase a. Design-Builder shall coordinate with Owner's consultants for punchlist item review and completion, and providing closeout documentation in a timely manner. All Interested Parties shall register for communications with FGM Architects no later than 09/24/2025. Please send email with the following information to Aaron Keistler at aaronkeistler@fgmarchitects.com: Subject: Bartelso School District 57 Design-Build Interested Party Registry Design-Build Entity information Name of Contact/Representation for the Design-Build Entity Submit any questions to aaronkeistler@fgmarchitects.com. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Educational

$200,000.00

Public - City

Renovation

4

6

6

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
203
Active Projects
91
Bidding Soon
1,502
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 7, 2025

February 9, 2026

Project location map

306 S Washington St, Bartelso, IL


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed