BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 2, 2025 at 7:00 PM

Updated December 3, 2025

Demolition, site work, paving and new construction of a mixed-use development in Placentia, California. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The City of Placentia invites sealed bids for a project to improve Golden Avenue Bridge and the related portion of the OC Bikeway Loop Segment D. Golden Avenue is a regionally significant collector roadway, providing east west travel between the cities of Placentia and Yorba Linda. The Golden Avenue roadway east and west of the bridge crossing currently provides one lane of travel in each direction with a center two way left turn lane. At the current bridge crossing the lane configuration is reduced to one lane in each direction with no center lane, sidewalks or bike lanes. The project would replace the existing bridge with a new two-lane bridge that would include sidewalk, a striped median center, bike lanes, hand railing and all related grading, drainage, utility, roadway improvements and such other items or details, not mentioned above, that are required to complete the project. The bridge will be widened from approximately 27' to 60'-4" and would have a similar roadway profile as the existing bridge. The existing bridge structure will be removed to be replaced with two new abutments. OC Bike Loop Segment D is an approximately 1.1-mile paved Class I bikeway between the cities of Brea and Placentia. Construction will be recently completed on a majority of the segment D alignment when the bridge project begins, with the remaining portion to be completed as a part of this project. All necessary right-of-way acquisition and easements have been completed. All construction work shall be in accordance with the project bid documents, plans, technical specifications and all other references as depicted in strict adherence to the 2021 Greenbook, City's standards and all other State and utility agency specifications. License Requirements Class "A" Liquidated Damages $4200/day Project Duration 120 Working Days Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Q&A Deadline 10/09/2025 5:00 PM (PDT) Online Q&A Yes Questions regarding this Notice Inviting Bids must be submitted in writing through the City of Placentias electronic bid management system

Award

Bridges / Tunnels

$4,687,011.00

Public - City

Demolition, New Construction, Paving, Site Work

94

13

99

6

Subscribe For Documents

105 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
544
Active Projects
230
Bidding Soon
3,743
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 16, 2025

December 15, 2025

Project location map

Golden Ave, Placentia, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.