Site work, new construction and addition to an elderly care / assisted living facility in Moreno Valley, California. Completed plans call for the addition of a elderly care / assisted living facility; for the construction of a elderly care / assisted living facility; and for site work for a elderly care / assisted living facility.

Project No: 30-23-01, 23-224, 2314 Estimated Bid Value $3,500,000 to $5,000,000 Project Duration 200 Working Days Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Q&A Deadline 09/30/2025 2:00 PM (PDT) This project will expand the existing Moreno Valley Senior Center on Fir Avenue by adding approximately 4,000 square feet of building space allowing the center to serve the growing number of senior citizens with additional programs, classes, events and social activities. The project will also include a new patio cover at the northwest corner of the existing building and upgrades to existing pedestrian walkways to meet current ADA standards, as well as include modifications to the existing parking lot and landscape areas, as shown on the project plans. The City previously exercised its right to terminate the original construction contract and is now seeking a Prime Contractor to complete the remaining work. The remaining work includes, but is not limited to: demolition, removals, compaction, foundation footings, erection/aligning and welding of structural steel, construction of CMU walls, slab on grade; installing a patio cover and supports, rough and finish plumbing, rough and finish electrical; rough and finish mechanical; exterior cladding; exterior and interior glazing, fire sprinklers and fire suppression systems; doors and hardware; gypsum board walls; miscellaneous metals, painting; flooring; toilet partitions; excavation; conduit, site utilities that include domestic water, fire water, sewer, telephone, cable, gas connections and other related utilities and connections; irrigation and landscaping, site hardscape; recycling of materials; preparation of redline as-built drawings, O&M manuals and other related work described in the Special Provisions including all parts of the Technical Provisions, Detailed Provisions and as shown and required in the Contract Documents to achieve Final Completion. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Elderly Care / Assisted Living

$5,765,000.00

Public - City

Addition, New Construction, Site Work

326

52

142

7

Subscribe For Documents

102 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
598
Active Projects
267
Bidding Soon
3,382
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 14, 2025

December 15, 2025

Project location map

25075 Fir Ave, Moreno Valley, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.