Published November 19, 2025 at 7:00 PM
Updated November 20, 2025
Site work for a water / sewer project in Moreno Valley, California. Completed plans call for site work for a water / sewer project.
SC-02: Under these Specifications the Contractor shall perform the installation of 3,160 feet of 12-inch pipeline parallel to the existing pipeline along Kalmia Avenue between Mar El Street and to the east of Rockspur Court. Contractor shall replace two existing 4-inch pressure-reducing valve stations (PRVs) with 6-inch PRVs. The PRVs to be replaced are located at Dalehurst Road and Ironwood Avenue, and at Steeplechase and Kalmia BPS. The work comprises construction of approximately 3,200 linear feet (LF) of pipeline. The District will be filing a notice of exemption for this project. Bid Bond 10.00% Q&A Deadline 10/14/2025 5:00 PM (PDT) All questions must be submitted through online by 5:00 p.m. on Tuesday, October 14, 2025. Please Note: Questions will be answered via Addendum only. The work to be constructed is located in the City of Moreno Valley. The work is comprised of the installation of new 12-inch PVC water pipeline parallel to an existing 8-inch CML&C water line located within Kalmia Avenue; between Mar El Street and to the east of Rockspur Court. In addition, the upsize of two 4-inch Pressure Reducing Valve Stations (PRVs) to 6-inch. The work comprises construction of approximately 3,200 linear feet of pipeline. Quantities are approximate. Bidders are responsible to verify actual quantities from the detailed design drawings to accurately calculate quantity take-offs. The work comprises construction of approximately 3,200 linear feet of pipeline. Quantities are approximate. Bidders are responsible to verify actual quantities from the detailed design drawings to accurately calculate quantity take-offs. he contract work site is in the City of Moreno Valley, County of Riverside. Pipeline improvements begin at Kalmia Ave and Mar El St., along Kalmia Ave for approximately 3,200-LF. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Bid Results
Water / Sewer
$1,436,425.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 6, 2025
January 5, 2026
Multiple Locations, Moreno Valley, CA
Related To This Project
Moreno Valley, CA
Bid Date: Oct 30 2025
Moreno Valley, CA
Bid Date: Nov 13 2025
Moreno Valley, CA
--
Moreno Valley, CA
Bid Date: Nov 24 2025
Moreno Valley, CA
Bid Date: Dec 04 2025
Moreno Valley, CA
Bid Date: Dec 11 2025
Moreno Valley, CA
Bid Date: Dec 18 2025
Moreno Valley, CA
Bid Date: Jan 23 2026
Moreno Valley, CA
Bid Date: Oct 29 2025
Moreno Valley, CA
Bid Date: Oct 14 2025
Moreno Valley, CA
Bid Date: Oct 16 2025
Moreno Valley, CA
Bid Date: Sep 04 2025
Moreno Valley, CA
Bid Date: Oct 01 2025
Moreno Valley, CA
--
Moreno Valley, CA
Bid Date: Aug 12 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.