BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 9, 2025 at 7:00 PM

Updated November 10, 2025

Site work, paving and new construction of a bridge / tunnel in West Point, Nebraska. Completed plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

construction of a 600' Concrete Girder bridge with concrete paving on a new alignment. The project site is located as follows: Starting at the Intersection of 18th St. N. and S. 13th St., thence heading southwest on 6th Road to the intersection on County River Road, all in Cuming County, Nebraska. The project is referred to as "Wisner Southwest C-20(574)" and shall include all labor, materials, transportation, and equipment required to construct: approximately 0.6 miles of 9" doweled concrete pavement with subgrade preparation, a 5-span, 600' concrete girder bridge with concrete approaches on a 0 skew, and other related incidental work. Along with its Bid Proposal, each bidder shall submit an unconditional Bid Bond or Certified Check made payable to the Cuming County Treasurer, Cuming County, Nebraska, in an amount equal to five (5) percent of the total Bid Proposal. Also, each bidder is to provide a Start of Construction Date and End of Construction for each site. The required completion date is June 30, 2027. The Contractor will be allowed five hundred and fifty (550) calendar days for completion of all work. The completion date will be the earlier of the date indicated in the bid proposal or the actual start date plus the allotted calendar days. Within ten (10) days following the award of the Contract, the successful bidder shall furnish a surety bond or bonds in an amount equal to or greater than the full amount of the contract. The surety and form of the bonds are subject to the acceptance by the Cuming County Board of Supervisors. The Cuming County Board of Supervisors reserves the right to reject any and all bids or to waive any irregularities in bids received. If you have any questions regarding this project or the enclosed information, please contact Mainelli Wagner & Associates, Inc. prior to the Bid Letting. Adam Mace, P.E. Mainelli Wagner & Associates, Inc. 6920 Van Dorn Street Lincoln, NE 68506 Phone: 402-421-1717

Award

Bridges / Tunnels

$7,678,929.00

Public - County

New Construction, Paving, Site Work

7

5

16

4

Subscribe For Documents

53 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
144
Active Projects
92
Bidding Soon
983
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 14, 2025

November 13, 2025

Project location map

Multiple Locations, West Point, NE

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.