BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 18, 2025 at 7:00 PM

Updated November 19, 2025

Site work and paving for a civil project in Miramar, Florida. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Counties: Broward, Miami-Dade Road Name: Tpk Ext (Sr821) Thru Lane Implementation (Mp 27-40.2 Limits: 87471000 Project(s): 44388235201(*) Federal Aid No: N/A Project(s): 44388245201 Federal Aid No: N/A Total Roadway Length: 32.797 Miles Contract Days: 296 Total Bridge Length: 0.000 Miles Total Proposal Length: 32.797 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 120 Work consists of providing all labor, materials, equipment and incidentals necessary for implementation of thru lanes along the Turnpike Extension (SR 821) from mile post 27 (SR 836 / SR 821 Interchange) to mile post 40.2 (Broward County Line) and from mile post 40.2 (Broward County Line) to mile post 47 (Turnpike). The project is divided into two separate FPID numbers at the Miami-Dade / Broward County Line. The improvements include milling and resurfacing, establishing ingress/egress locations, establishing the double solid white striping thru lane buffer, and installing thru lane sign panels on existing sign structures. ITS is required for the Toll Amount Dynamic Message Signs (TADMS) needed to sign motorists to the I-75 Express Lanes. No Pre-Bid Conference. Contractor must be prequalified. Question Deadline 10/14/2025 at 5:00 PM ET, Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online, for questions posted after this deadline, an answer cannot be assured. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - 005 - Hot Plant-Mixed Bituminous Course/Pavement Marking - SR 821

Award

Roads / Highways

$3,853,385.00

Public - State/Provincial

Paving, Site Work

127

7

4

6

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
264
Active Projects
108
Bidding Soon
2,114
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 21, 2025

December 22, 2025

Project location map

FL-821, Miramar, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.