BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 19, 2025 at 7:00 PM

Updated November 20, 2025

Site work for a water / sewer project in Fayetteville, Arkansas. Working plans call for site work for a water / sewer project.

As of November 19, 2025, project is cancelled. No definite date for the rebid. Waterline Replacement Questions regarding this bid should be addressed to Kenny Fitch, Sr Procurement Agent at kfitch@fayetteville-ar.gov. Each bid exceeding $50,000shall be accompanied by a cashier's check from a bank doing business in the State of Arkansas or a corporate bid bond for five (5) percent of the amount bid. In the event a bidder opts to submit a cashier's check for a bid bond, the actual physical cashier's check shall be delivered to the City prior to the deadline. One hundred percent (100%) performance and payment bonds are required after the contract award. This amount includes any approved contingency. The City of Fayetteville will be installing a new 6" water main along Ridgeway Drive and Crestwood Drive. The City requires the services of a licensed plumbing contractor to transition approximately 66 residential service connections from the existing water line to the newly installed main. Historically, service lines in this area were connected to the original water main located in the rear yards of most properties. This new water main is being installed along the front of the residences, and all service connections will be reconfigured accordingly to improve accessibility and infrastructure reliability. 2) Bidders shall furnish evidence that they have experience in the type of work as outlined in the bid specifications and shall include specific experience. A minimum of four (4) references must be submitted with each bid for projects that have been completed within the past five (5) years. 3) Bidders shall provide bid pricing in a lump sum format. 4) The following tasks will be the responsibility of the City of Fayetteville: a) The City shall acquire a Temporary Construction Easement which will grant the City and the plumbing contractor access to the site. b) The City shall install new meter boxes, yokes, copper tailpieces, and taps into the new water line. c) The City shall close the corporation stop valves on the old line. The City of Fayetteville shall not be responsible for lost or misdirected bids, or failure of bidder's technical equipment. The City of Fayetteville encourages all qualified small, minority and women business enterprises to bid on and receive contracts for goods, services, and construction. Also, the City of Fayetteville encourages all general contractors to subcontract portions of their contract to qualified small, minority and women business enterprises. Bidders shall have a valid State of Arkansas Contractor's License at the time of the bid deadline and a valid registration in good standing with the Arkansas Secretary of State at the time of the contract award.

Final Planning

Water / Sewer

$560,135.00

Public - City

Site Work

4

6

4

11

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
114
Active Projects
54
Bidding Soon
890
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 14, 2025

May 19, 2026

Project location map

W Ridgeway Dr & Crestwood Dr, Fayetteville, AR


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.