Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 22, 2025 at 8:00 PM
Updated September 24, 2025
Renovation of a military facility in Hurlburt Field, Florida. Completed plans call for the renovation of a military facility.
Project Description: a. Mechanical: The existing chilled water VAV air handling unit, will be replaced with a new chilled water VAV air handling unit with electric reheat. The boilers, hot water pumps, hot water piping, accessories and controls will be demolished due to the electrification of this project. A new constant volume air handling unit will be provided for Maintenance Support Room 102 and 102 Mezzanine. The existing fan coil unit will be replaced with a new chilled water fan coil unit. All VAV boxes will be replaced. Ductwork will be reused where possible. New air-cooled chiller, chilled water pumps, piping, accessories and controls will be provided to serve the building. A new exhaust fan will be installed to serve the restrooms. The existing HVUs and ductwork will be abandoned in place, and new gas fired radiant heaters will be provided in the hangar bay. b. Electrical: The existing mechanical equipment as described in the mechanical scope shall be removed by the mechanical contractor. The electrical contractor shall disconnect existing equipment. Equipment will have existing conduit and wire removed back to the serving panel/source. New circuits (conduit and wire) shall be installed to the new equipment. The chiller ACC-1 is the only exception where existing conduit will remain for reuse with new wire. Existing breakers will be reused in panels where possible. New disconnects will be installed with the new circuiting and equipment. Existing panels that are serving existing equipment will remain and be reused for the new equipment where possible. A new 125 amp, 480V, 3 phase panel will be installed to serve the new 1st floor equipment. But not limited to please review the specifications for more information. Prevailing Wages Apply. Contract duration = 270 calendar days Direct all RFI's, bids, and scope letters to the following individuals/emails: 1. Daniel Carruth - dcarruth@bbch-llc.com 2. Alan Lacey - alacey@bbch-llc.com 3. const-bids@bbch-llc.com
Post-Bid
Military
$200,000.00
Public - Federal
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 23, 2025
October 23, 2025
To Be Determined, Hurlburt Field, FL
Related To This Project
Hurlburt Field, FL
Bid Date: Nov 13 2025
Hurlburt Field, FL
Bid Date: Nov 19 2025
Hurlburt Field, FL
Bid Date: Nov 03 2025
Hurlburt Field, FL
Bid Date: Nov 10 2025
Hurlburt Field, FL
Bid Date: Dec 19 2025
Hurlburt Field, FL
Bid Date: Jan 16 2026
Hurlburt Field, FL
--
Hurlburt Field, FL
--
Hurlburt Field, FL
Bid Date: Sep 24 2025
Hurlburt Field, FL
Bid Date: Oct 02 2025
Hurlburt Field, FL
Bid Date: Sep 22 2025
Hurlburt Field, FL
--
Hurlburt Field, FL
Bid Date: Aug 29 2025
Hurlburt Field, FL
Bid Date: Sep 19 2025
Hurlburt Field, FL
Bid Date: Sep 15 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
