BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 2, 2025 at 8:00 PM

Updated November 27, 2025

Renovation of a mixed-use development in Colorado Springs, Colorado. Completed plans call for the renovation of a educational facility.

September 24, 2025 by 2:00 P.M Deadline for Emailed Questions to kris.garnhart@asd20.org September 25, 2025 Responses to Questions There will be a mandatory pre-proposal conference/job walk held for this project on September 19, 2025 at 7:00am starting at Eagleview Middle School, 1325 Vindicator Dr, Colorado Springs, CO 80919. We will then proceed to Rockrimmon Elementary School, 194 Mikado Dr W, Colorado Springs, CO 80919, then to Woodmen Roberts Elementary School, 8365 Orchard Path Rd, Colorado Springs, CO 80919, then to Edith Wolford Elementary School, 13710 Black Forest Rd, Colorado Springs, CO 80908, then to Pine Creek High School, 10750 Thunder Mountain Ave, Colorado Springs, CO 80908, and finally to Mountain View Elementary School, 10095 Lexington Dr, Colorado Springs, CO 80920. Scope of Services The Contractor will be expected to provide specific construction management services as described below: a. Project Control - Monitor the work of the subcontractors and coordinate the work with the activities and responsibilities of the District and Architect/Engineer to complete the project in accordance with the Districts objectives of cost, time and quality. b. Maintain a competent full-time staff at the project site to coordinate and provide general direction of the work and progress of the subcontractors on the project. c. Establish on-site organization and lines of authority in order to carry out the overall plans of the construction team. d. Work with the District to establish procedures for coordination among the District, Architect/Engineer, and subcontractors with respect to all aspects of the project and implement such procedures. e. Attend progress meetings at which subcontractors, District, Architect-Engineer and contractor can discuss jointly such matters as procedures, progress, problems and scheduling. Provide a detailed schedule for the operation of the contractor and subcontractors on the project, including realistic activity sequences and duration's, allocation of labor and materials, processing of shop drawings and samples and delivery of products requiring long lead-time procurements include the District's occupancy requirements showing portions of the project having occupancy priority, if any. f. Provide regular monitoring of the schedule as construction progresses. Identify potential variances between scheduled and probable completion dates. Review schedule for work not started orincomplete and recommend to the District and subcontractors adjustments in the schedule to meet the probable completion date. Provide summary reports of each monitoring and document all changes in schedule. g. Determine the adequacy of the subcontractor's personnel and equipment and the availability of materials and supplies to meet the schedule. h. Cost Control - Develop and monitor an effective system of project cost control, showing actual costs for activities in process and estimates for uncompleted tasks. Revise and refine the initially approved Project Construction Budget, incorporate approved changes as they occur and develop cash flow reports and forecasts as needed. i. Change Orders - Utilize Districts Change Order system. Recommend necessary or desirable changes to the District and the Architect/Engineer, review requests for and submit recommendations to the District and the Architect-Engineer. j. Permits and Fees - Obtain all building permits and special permits for permanent improvements, excluding permits for inspection or temporary facilities required to be obtained.

Post-Bid

Educational

$25,000.00

Public - City

Renovation

10

4

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
202
Active Projects
84
Bidding Soon
918
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 1, 2025

October 31, 2025

Project location map

Multiple Locations, Colorado Springs, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.