BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 3, 2025 at 8:00 PM

Updated October 4, 2025

Site work and new construction of a pre-engineered storage facility in Myrtle Point, Oregon. Working plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

As of October 3, 2025, project is cancelled. The Coos County Fair Board plans to re-solicit this project in the near future. Coos County is soliciting bids from qualified, licensed, and bonded contractors for the construction of a new covered Pole Barn Pavilion at the Coos County Fairgrounds, Myrtle Point, Oregon. The project consists of a 40' x 60' (approximately 2,400 sq. ft.) timber frame pavilion, to be built in its entirety, and includes site preparation, concrete foundations, timber frame erection, roofing, water service, and finishes, in accordance with the project plans prepared by Timber Frame Headquarters (TFHQ), with supporting geotechnical recommendations by Strata Design, LLC. Question Deadline 09/30/2025 at 4:00 PM PT All inquiries, whether relating to the bid process, administration, deadline, award, or technical aspects of the project shall be in writing and directed to: Coos County Fair Board Attn: Lisa Dumire 770 4th Street Myrtle Point, OR 97458 ldumire@co.coos.or.us SCOPE OF PROJECT The selected contractor shall perform all work necessary to complete the project in accordance with the attached Fairgrounds Midway Pavilion Project details, plans, drawings and specifications by Timber Frame Headquarters (TFHQ), including such incidentals as may be necessary to meet applicable agency requirements and others as necessary to provide a complete project. All work must be completed in accordance with County requirements and be inspected for approval by the Coos County Fair Board. The selected contractor shall provide all labor, equipment, materials, and permits necessary to complete the required work in a safe manner.

Final Planning

Warehouse / Distribution - Pre-Engineered Storage Building

$250,000.00

Public - County

New Construction, Site Work

55

4

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
33
Active Projects
18
Bidding Soon
194
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 6, 2025

November 6, 2025

Project location map

840 4th St, Myrtle Point, OR


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.