Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 3, 2025 at 8:00 PM
Updated October 4, 2025
Site work and new construction of a pre-engineered storage facility in Myrtle Point, Oregon. Working plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.
As of October 3, 2025, project is cancelled. The Coos County Fair Board plans to re-solicit this project in the near future. Coos County is soliciting bids from qualified, licensed, and bonded contractors for the construction of a new covered Pole Barn Pavilion at the Coos County Fairgrounds, Myrtle Point, Oregon. The project consists of a 40' x 60' (approximately 2,400 sq. ft.) timber frame pavilion, to be built in its entirety, and includes site preparation, concrete foundations, timber frame erection, roofing, water service, and finishes, in accordance with the project plans prepared by Timber Frame Headquarters (TFHQ), with supporting geotechnical recommendations by Strata Design, LLC. Question Deadline 09/30/2025 at 4:00 PM PT All inquiries, whether relating to the bid process, administration, deadline, award, or technical aspects of the project shall be in writing and directed to: Coos County Fair Board Attn: Lisa Dumire 770 4th Street Myrtle Point, OR 97458 ldumire@co.coos.or.us SCOPE OF PROJECT The selected contractor shall perform all work necessary to complete the project in accordance with the attached Fairgrounds Midway Pavilion Project details, plans, drawings and specifications by Timber Frame Headquarters (TFHQ), including such incidentals as may be necessary to meet applicable agency requirements and others as necessary to provide a complete project. All work must be completed in accordance with County requirements and be inspected for approval by the Coos County Fair Board. The selected contractor shall provide all labor, equipment, materials, and permits necessary to complete the required work in a safe manner.
Final Planning
Warehouse / Distribution - Pre-Engineered Storage Building
$250,000.00
Public - County
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 6, 2025
November 6, 2025
840 4th St, Myrtle Point, OR
Related To This Project
Myrtle Point, OR
Bid Date: Jul 31 2025
Myrtle Point, OR
Bid Date: Jun 18 2025
Myrtle Point, OR
Bid Date: Apr 25 2024
Myrtle Point, OR
Bid Date: Mar 28 2024
Myrtle Point, OR
Bid Date: Dec 11 2023
Myrtle Point, OR
Bid Date: Jan 16 2020
Myrtle Point, OR
--
Myrtle Point, OR
Bid Date: Jan 20 2022
Myrtle Point, OR
Bid Date: Jul 19 2022
Myrtle Point, OR
Bid Date: Jul 12 2022
Myrtle Point, OR
Bid Date: Apr 14 2022
Myrtle Point, OR
Bid Date: Apr 14 2022
Myrtle Point, OR
Bid Date: Oct 19 2022
Beaverton, OR
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
