BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 28, 2025 at 8:00 PM

Updated October 29, 2025

Site work for a water / sewer project in Saint Louis, Missouri. Completed plans call for site work for a water / sewer project.

The work to be done under this contract consists of the construction of approximately 158 lineal feet of 18-inch diameter combined sewer, utilizing pipe bursting methods, and appurtenances to be constructed in an area located south of Interstate 44 and east of South Kingshighway Boulevard, in the City of St. Louis, Missouri. The Engineers Opinion of Probable Cost for this project is $322,000. The proposal shall be accompanied by a certified check or cashier's check on a bank or trust company in St. Louis County or in the City of St. Louis or by a bidder's bond, for an amount not less than five (5%) percent of the bid amount as bid security to the District. At the same time the successful bidder shall also file with the District two (2) copies of both a Contract Bond for one hundred (100%) percent of the contract amount, and an acceptable Certificate of Insurance and Insurance Binder or policy for the required insurance coverage. The Contractor shall commence work within ten (10) days after the date of written notice from the District to begin and shall complete all work within one hundred and twenty (120) calendar days after the expiration of such ten (10) day period. The Metropolitan St. Louis Sewer District (District) has established subcontractor goals for Building Construction (21% MBE and 10% WBE) and Non-Building Construction (10% MBE and 10% WBE) in the amount of $50,000 or more. Workforce goal requirements of 37% Minority, 11% Women, and 46% Apprentice (when applicable) apply to contracts in the amount of $500,000 or more. The District reserves the right to reject any and all bids, offers or proposals submitted, to accept the proposal that it deems to be to its best interest, or to advertise for new bids. The District reserves the right to defer the acceptance of any proposal and the award and execution of a contract for a period not exceeding ninety (90) days after the date of opening the bids. The Metropolitan St. Louis Sewer District (District) has established subcontractor goals for Building Construction (21% MBE and 10% WBE) and Non-Building Construction (10% MBE and 10% WBE) in the amount of $50,000 or more. Workforce goal requirements of 37% Minority, 11% Women, and 46% Apprentice (when applicable) apply to contracts in the amount of $500,000 or more. The requirements are further explained in the attached Business Diversity Utilization and Workforce Program document

Award

Water / Sewer

$322,000.00

Public - City

Site Work

4

3

2

4

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
42
Active Projects
1
Bidding Soon
900
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 22, 2025

November 21, 2025

Project location map

Multiple Locations, Saint Louis, MO


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.