Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published October 6, 2025 at 8:00 PM
Updated October 7, 2025
Site work and new construction of a transportation facility in Mineral, Washington. Completed plans call for the construction of a transportation facility; and for site work for a transportation facility.
Construction of a transit bus stop and EV charging site, located at 104 East Front Street, Mineral, WA 98355. This project will consist of installation of an electric vehicle charging station at the site of an existing convenience market and construction of sidewalk along a portion of the adjacent public right-of-way. The detailed project design criteria requested by the Owner for your respected component are available later in this bid packet. For any questions on project specifications or scope of work, please contact the Executive Director via e-mail at joe@lewiscountytransit.org. This project has an approximate start date of October 1, 2025 and a target completion date on or before December 31, 2025. The work associated with the electric vehicle charging station includes installing erosion control measures, minor demolition, clearing, grubbing, grading, placing and compacting fill, concrete paving, and sidewalk with associated aggregate base, gravel surfacing, bollards, pavement markings, and sign installation. Electrical work includes the installation of one (1) new Level 3 charging station (furnished by Lewis County Transit) and a new electrical service to the charging station. The contractor shall coordinate with Lewis County PUD to install the new service. Sundry electrical work includes furnishing and installing a concrete base for the charging station, trenching for electric conduits, and furnishing and installing electrical service panels on exterior mounting. Commissioning and startup of the charging station is incidental to the work. Access to the market must be maintained during the market's business hours. The contractor shall coordinate with the market's management during the execution of the work. Sidewalk construction in the adjacent County right-of-way includes installing erosion control devices, minor demolition including sawcutting, removal and disposal of existing sidewalk, curb, gutter, and asphalt pavement, clearing, grubbing, grading, and placing and compacting fill. Approximately 100 square feet of new cast-in-place concrete sidewalk are to be constructed with an ADA-compliant curb ramp with detectable warning surface. The adjacent curb and gutter are to be replaced with new cast-in-place curb and gutter. Pavement patching and other miscellaneous restoration of the roadway surface and surroundings are incidental to the work. Traffic control per an approved traffic control plan shall be included for work within the County's right-of-way. Coordination with Lewis County is incidental to the work.
Post-Bid
Transportation Terminals
$500,000.00
Public - County
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 30, 2025
October 1, 2025
104 E Front St, Mineral, WA
Related To This Project
Mineral, WA
Bid Date: Jul 31 2026
Bremerton, WA
Bid Date: Oct 10 2025
Marysville, WA
--
East Wenatchee, WA
Bid Date: Sep 23 2025
Colville, WA
--
Okanogan, WA
--
Conconully, WA
--
Bremerton, WA
--
Olympia, WA
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
