BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 16, 2025 at 8:00 PM

Updated October 17, 2025

Renovation of a transportation facility in Saint Paul, Minnesota. Completed plans call for the renovation of a transportation facility.

This project hardens Primary and Secondary of FIS processing at Terminals 1 and 2. Provide Low glass gates and partitions at Primary. Provide storefront and doors at Secondary. Secondary to have electronic security features. WORK COVERED BY CONTRACT DOCUMENTS A. Work of this Contract comprises: The work of 2025 FIS Facility Upgrades: Project located at the Minneapolis Saint Paul International Airport, Wold Chamberlain Field, Saint Paul, Minnesota 55111, for the Metropolitan Airports Commission, Owner On site work other than investigation and planning for this project in Terminal 1 may not begin until after April 20, 2026 unless otherwise approved by the Owner and Construction Coordinator. N. Work in Terminal 1.++++++++++++++++++++++++++++ 1. See general notes above that apply to both Terminals. Notes specific to work in Terminal 1 below. 2. Work at removed kiosk locations to be expedited, but is not expected to be completed in a single shift. Temporary half-height walls/barriers must be installed at removed kiosk locations until complete. 3. Existing carpet to be removed and reinstalled. A future project will be replacing all carpet in T1. Some new carpet will be required at the removed kiosk locations. O. Work in Terminal 2. 1. See general notes above that apply to both Terminals. Notes specific to work in Terminal 2 below. 2. Passenger access through the T2 CBP area and specifically through the new slider doors must be maintained at all times.+ P. Substantial Completion++ 1. August 14, 2026 2. The Contractor must complete all project work in both Terminal 1 and Terminal 2 by the date noted above.++++++ 3. Includes Liquidated Damages for non-completion of Substantial Completion Milestone. Refer to Section 00 73 10 - Supplementary Conditions.+ Q. Project Closeout 1. November 11, 2026 2. Complete all remaining commissioning and punch lists within 30 calendar days after the Substantial Completion. 3. Complete all project closeout items within 90 calendar days after the Substantial Completion date.+ 4. Includes Liquidated Damages for non-completion of Final Completion. Refer to Section 00 73 10- Supplementary Conditions. R. Failure to conform to the Project Schedule No oral interpretation will be made to any Bidder as to the meaning of the specification or of the Drawings incorporated therein by reference or otherwise. Every request for such an interpretation shall be made in writing to Alliiance, Paul Merrell (pmerrell@alliiance.com), MSP International Airport, 4300 Glumack Drive, Suite LT-3191, St. Paul, MN 55111. Question Deadline 10/07/2025

Bid Results

Transportation Terminals

$1,144,300.00

Public - State/Provincial

Renovation

50

23

19

5

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
313
Active Projects
183
Bidding Soon
1,536
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 14, 2025

April 20, 2026

Project location map

4300 Glumack Dr, Saint Paul, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.