Renovation of a residential development in Baltimore, Maryland. Completed plans call for the renovation of a residential development.
The Contractor shall supply all labor, material, supervision, equipment, insurance, permits including U&O (Unit of Occupancy Permit) and all other incidentals required to complete the work items listed below as requested by HABC, in accordance with all applicable federal, state and local regulations. Locations: 1523-25 Cherry Hil Bid Sheets -2704 Fisk Rd, 2702 Claflin Ct, 2802 Winwood Ct, 2814 Carver Rd, 904 Bunche Rd, 942 Seagull Ave, and 3472 Spelman Rd. Questions Due Date: Sep 30th 2025, 2:00 PM EDT Completion date of 30 days upon Notice to Proceed date. Address: 2802 Winwood Ct General: 1. Remove a 2802nd properly dispose of all Bulk Trash, Furniture and Miscellaneous Items in the Unit. 2. Remove all existing appliances and range hood 3. Install closet shelving/closet rod as necessary 4. Install interior handrail in stairwell of unit if needed 5. Final Cleaning of Entire Unit to Make Ready for Occupancy. 6. Contractor is to provide all materials 7. Power wash exterior if needed 8. Repair exterior concrete repairs if needed 9. Replace all angle stops and water shut off valves 10. Replace gas shut off valves Bathrooms: 1. Install Vanity Cabinet w/ Vanity Bowl and faucet delta faucet only 2. Supply and install One (1) new 16-inch elongated toilet and seat 3. Install New Medicine Cabinet with Mirror 4. Install all new bathroom Accessories, Non-UFAS 5. Remove and install new tub, shower wall, faucet and showerhead 6. Install ceramic flooring 7. Replace angle stops 8. Seal all plumbing penetrated areas Kitchen: 1. Replace damaged or worn cabinetry with HUD Severe Use base and wall Magnolia Cabinets 2. Install Postformed Wilsonart Black Granite Laminate countertops 3. Install Broan #4100 range hood (Black) 4. Supply and install single bowl stainless steel kitchen sink and faucet delta faucet only 5. Install GFI above kitchen sink 6. Install receptacle behind stove 7. Replace angle stops 8. Seal all plumbing penetrated areas 9. Install rat guard behind base cabinets, stove and refrigerator inspection needed when done Mechanical / Plumbing: 1. Check and Inspect Gas Distribution (Stove) for service and repair any leaks. 2. Water Distribution (Bathroom & Kitchen) for leaks, repair leaks throughout whole unit 3. Inspect and Repair (if necessary) Drain, Water & Vent (Bathroom and Kitchen, toilets) 4. Replace all convectors secure to wall with 3/4 plywood and paint, replace copper line tie in 5. Convector will be provided by site 6. Delta Faucets Only for all faucet fixtures Electrical: 1. Replace all Switches / Receptacles and metal cover plates. 2. Replace existing raceways and install new raceways through out entire unit 2. Check Electric Service Panel for Gaps/Missing Breakers/Doors. 3. Replace all light fixtures with LED integrated light fixtures. 4. Install 10 yr sealed smoke detectors in every bedroom BRK Smoke Detector 5. Install combination smoke / carbon monixide detectors on 1st and 2nd Floor common areas Doors & Windows: 1. Replace all interior doors with solid wood doors 2. Supply and install vertical blinds in all windows 3. Clean all window wells and seals (Lead Testing) 4. Repair or Replace windows through out unit if needed 5. Replace Front and Rear Exterior Door 6. Replace Door Sweep and Weatherstipping Painting/Drywall Repair: 1. Supply all materials to Paint the Entire Units to Include: o Walls and ceilings shall be painted with two finish coats eggshell latex. o Kitchen and bathroom walls & ceilings, and all doors, shall receive a semi-gloss final finish coat. o Exterior door and frame, porch front and exterior railing shall be painted (Lead Testing) o The Contractor shall be responsible for all drywall repairs, point-up and resulting painting required, ensuring a high-quality finish that is acceptable to the HABC Housing Management. o Paint shall be Sherwin Williams "Pro-Mar 200" in HABC Antique White color (or brand of equal color, finish, durability, etc.). o The Contractor shall follow United States Environmental Protection Agency (EPA) Lead-Based Paint Renovation, Repair and Painting (RRP) Program Rules. Flooring: 1. Supply and install lifeproof Rigid Core Luxury Vinyl Flooring throughout entire unit 2. All floors must be level before applying flooring... 3. Replace all treads and risers 4. Supply and install 4" Baseboard with Quarter Inch Round shoe molding and caulk as needed throughout unit. Address: 942 Seagull Ave. General: 1. Remove and properly dispose of all Bulk Trash, Furniture and Miscellaneous Items in the Unit. 2. Remove all existing appliances and range hood 3. Install closet shelving/closet rod as necessary 4. Install interior handrail in stairwell of unit if needed 5. Final Cleaning of Entire Unit to Make Ready for Occupancy. 6. Contractor is to provide all materials 7. Power wash exterior if needed 8. Repair exterior concrete repairs if needed 9. Replace all angle stops and water shut off valves 10. Replace gas shut off valves Bathrooms: 1. Install Vanity Cabinet w/ Vanity Bowl and faucet delta faucet only 2. Supply and install One (1) new 16-inch elongated toilet and seat 3. Install New Medicine Cabinet with Mirror 4. Install all new bathroom Accessories, Non-UFAS 5. Remove and install new tub, shower wall, faucet and showerhead 6. Install ceramic flooring 7. Replace angle stops 8. Seal all plumbing penetrated areas Kitchen: 1. Replace damaged or worn cabinetry with HUD Severe Use base and wall Magnolia Cabinets 2. Install Postformed Wilsonart Black Granite Laminate countertops 3. Install Broan #4100 range hood (Black) 4. Supply and install single bowl stainless steel kitchen sink and faucet delta faucet only 5. Install GFI above kitchen sink 6. Install receptacle behind stove 7. Replace angle stops 8. Seal all plumbing penetrated areas 9. Install rat guard behind base cabinets, stove and refrigerator inspection needed when done Mechanical / Plumbing: 1. Check and Inspect Gas Distribution (Stove) for service and repair any leaks. 2. Water Distribution (Bathroom & Kitchen) for leaks, repair leaks throughout whole unit 3. Inspect and Repair (if necessary) Drain, Water & Vent (Bathroom and Kitchen, toilets) 4. Replace all convectors secure to wall with 3/4 plywood and paint, replace copper line tie in 5. Convector will be provided by site 6. Delta Faucets Only for all faucet fixtures Electrical: 1. Replace all Switches / Receptacles and metal cover plates. 2. Replace existing raceways and install new raceways through out entire unit 2. Check Electric Service Panel for Gaps/Missing Breakers/Doors. 3. Replace all light fixtures with LED integrated light fixtures. 4. Install 10 yr sealed smoke detectors in every bedroom BRK Smoke Detector 5. Install combination smoke / carbon monixide detectors on 1 st and 2 nd Floor common areas Doors & Windows: 1. Replace all interior doors with solid wood doors 2. Supply and install vertical blinds in all windows 3. Clean all window wells and seals (Lead Testing) 4. Repair or Replace windows through out unit if needed 5. Replace Front and Rear Exterior Door 6. Replace Door Sweep and Weatherstipping Painting/Drywall Repair: 1. Supply all materials to Paint the Entire Units to Include: o Walls and ceilings shall be painted with two finish coats eggshell latex. o Kitchen and bathroom walls & ceilings, and all doors, shall receive a semi-gloss final finish coat. o Exterior door and frame, porch front and exterior railing shall be painted (Lead Testing) o The Contractor shall be responsible for all drywall repairs, point-up and resulting painting required, ensuring a high-quality finish that is acceptable to the HABC Housing Management. o Paint shall be Sherwin Williams "Pro-Mar 200" in HABC Antique White color (or brand of equal color, finish, durability, etc.). o The Contractor shall follow United States Environmental Protection Agency (EPA) Lead-Based Paint Renovation, Repair and Painting (RRP) Program Rules. Flooring: 1. Supply and install lifeproof Rigid Core Luxury Vinyl Flooring throughout entire unit 2. All floors must be level before applying flooring... 3. Replace all treads and risers 4. Supply and install 4" Baseboard with Quarter Inch Round shoe molding and caulk as needed throughout unit. Address: 3472 Spelman Rd General: 1. Remove and properly dispose of all Bulk Trash, Furniture and Miscellaneous Items in the Unit. 2. Remove all existing appliances and range hood 3. Install closet shelving/closet rod as necessary 4. Install interior handrail in stairwell of unit if needed 5. Final Cleaning of Entire Unit to Make Ready for Occupancy. 6. Contractor is to provide all materials 7. Power wash exterior if needed 8. Repair exterior concrete repairs if needed 9. Replace all angle stops and water shut off valves 10. Replace gas shut off valves Bathrooms: 1. Install Vanity Cabinet w/ Vanity Bowl and faucet delta faucet only 2. Supply and install One (1) new 16-inch elongated toilet and seat 3. Install New Medicine Cabinet with Mirror 4. Install all new bathroom Accessories, Non-UFAS 5. Remove and install new tub, shower wall, faucet and showerhead 6. Install ceramic flooring 7. Replace angle stops 8. Seal all plumbing penetrated areas Kitchen: 1. Replace damaged or worn cabinetry with HUD Severe Use base and wall Magnolia Cabinets 2. Install Postformed Wilsonart Black Granite Laminate countertops 3. Install Broan #4100 range hood (Black) 4. Supply and install single bowl stainless steel kitchen sink and faucet delta faucet only 5. Install GFI above kitchen sink 6. Install receptacle behind stove 7. Replace angle stops 8. Seal all plumbing penetrated areas 9. Install rat guard behind base cabinets, stove and refrigerator inspection needed when done Mechanical / Plumbing: 1. Check and Inspect Gas Distribution (Stove) for service and repair any leaks. 2. Water Distribution (Bathroom & Kitchen) for leaks, repair leaks throughout whole unit 3. Inspect and Repair (if necessary) Drain, Water & Vent (Bathroom and Kitchen, toilets) 4. Replace all convectors secure to wall with 3/4 plywood and paint, replace copper line tie in 5. Convector will be provided by site 6. Delta Faucets Only for all faucet fixtures Electrical: 1. Replace all Switches / Receptacles and metal cover plates. 2. Replace existing raceways and install new raceways through out entire unit 2. Check Electric Service Panel for Gaps/Missing Breakers/Doors. 3. Replace all light fixtures with LED integrated light fixtures. 4. Install 10 yr sealed smoke detectors in every bedroom BRK Smoke Detector 5. Install combination smoke / carbon monixide detectors on 1 st and 2 nd Floor common areas Doors & Windows: 1. Replace all interior doors with solid wood doors 2. Supply and install vertical blinds in all windows 3. Clean all window wells and seals (Lead Testing) 4. Repair or Replace windows through out unit if needed 5. Replace Front and Rear Exterior Door 6. Replace Door Sweep and Weatherstipping Painting/Drywall Repair: 1. Supply all materials to Paint the Entire Units to Include: o Walls and ceilings shall be painted with two finish coats eggshell latex. o Kitchen and bathroom walls & ceilings, and all doors, shall receive a semi-gloss final finish coat. o Exterior door and frame, porch front and exterior railing shall be painted (Lead Testing) o The Contractor shall be responsible for all drywall repairs, point-up and resulting painting required, ensuring a high-quality finish that is acceptable to the HABC Housing Management. o Paint shall be Sherwin Williams "Pro-Mar 200" in HABC Antique White color (or brand of equal color, finish, durability, etc.). o The Contractor shall follow United States Environmental Protection Agency (EPA) Lead-Based Paint Renovation, Repair and Painting (RRP) Program Rules. Flooring: 1. Supply and install lifeproof Rigid Core Luxury Vinyl Flooring throughout entire unit 2. All floors must be level before applying flooring... 3. Replace all treads and risers 4. Supply and install 4" Baseboard with Quarter Inch Round shoe molding and caulk as needed throughout unit. Address: 2702 Claflin Ct General: 1. Remove and properly dispose of all Bulk Trash, Furniture and Miscellaneous Items in the Unit. 2. Remove all existing appliances and range hood 3. Install closet shelving/closet rod as necessary 4. Install interior handrail in stairwell of unit if needed 5. Final Cleaning of Entire Unit to Make Ready for Occupancy. 6. Contractor is to provide all materials 7. Power wash exterior if needed 8. Repair exterior concrete repairs if needed 9. Replace all angle stops and water shut off valves 10. Replace gas shut off valves Bathrooms: 1. Install Vanity Cabinet w/ Vanity Bowl and faucet delta faucet only 2. Supply and install One (1) new 16-inch elongated toilet and seat 3. Install New Medicine Cabinet with Mirror 4. Install all new bathroom Accessories, Non-UFAS 5. Remove and install new tub, shower wall, faucet and showerhead 6. Install ceramic flooring 7. Replace angle stops 8. Seal all plumbing penetrated areas Kitchen: 1. Replace damaged or worn cabinetry with HUD Severe Use base and wall Magnolia Cabinets 2. Install Postformed Wilsonart Black Granite Laminate countertops 3. Install Broan #4100 range hood (Black) 4. Supply and install single bowl stainless steel kitchen sink and faucet delta faucet only 5. Install GFI above kitchen sink 6. Install receptacle behind stove 7. Replace angle stops 8. Seal all plumbing penetrated areas 9. Install rat guard behind base cabinets, stove and refrigerator inspection needed when done Mechanical / Plumbing: 1. Check and Inspect Gas Distribution (Stove) for service and repair any leaks. 2. Water Distribution (Bathroom & Kitchen) for leaks, repair leaks throughout whole unit 3. Inspect and Repair (if necessary) Drain, Water & Vent (Bathroom and Kitchen, toilets) 4. Replace all convectors secure to wall with 3/4 plywood and paint, replace copper line tie in 5. Convector will be provided by site 6. Delta Faucets Only for all faucet fixtures Electrical: 1. Replace all Switches / Receptacles and metal cover plates. 2. Replace existing raceways and install new raceways through out entire unit 2. Check Electric Service Panel for Gaps/Missing Breakers/Doors. 3. Replace all light fixtures with LED integrated light fixtures. 4. Install 10 yr sealed smoke detectors in every bedroom BRK Smoke Detector 5. Install combination smoke / carbon monixide detectors on 1 st and 2 nd Floor common areas Doors & Windows: 1. Replace all interior doors with solid wood doors 2. Supply and install vertical blinds in all windows 3. Clean all window wells and seals (Lead Testing) 4. Repair or Replace windows through out unit if needed 5. Replace Front and Rear Exterior Door 6. Replace Door Sweep and Weatherstipping Painting/Drywall Repair: 1. Supply all materials to Paint the Entire Units to Include: o Walls and ceilings shall be painted with two finish coats eggshell latex. o Kitchen and bathroom walls & ceilings, and all doors, shall receive a semi-gloss final finish coat. o Exterior door and frame, porch front and exterior railing shall be painted (Lead Testing) o The Contractor shall be responsible for all drywall repairs, point-up and resulting painting required, ensuring a high-quality finish that is acceptable to the HABC Housing Management. o Paint shall be Sherwin Williams "Pro-Mar 200" in HABC Antique White color (or brand of equal color, finish, durability, etc.). o The Contractor shall follow United States Environmental Protection Agency (EPA) Lead-Based Paint Renovation, Repair and Painting (RRP) Program Rules. Flooring: 1. Supply and install lifeproof Rigid Core Luxury Vinyl Flooring throughout entire unit 2. All floors must be level before applying flooring... 3. Replace all treads and risers 4. Supply and install 4" Baseboard with Quarter Inch Round shoe molding and caulk as needed throughout unit. Address: 2814 Carver Rd General: 1. Remove and properly dispose of all Bulk Trash, Furniture and Miscellaneous Items in the Unit. 2. Remove all existing appliances and range hood 3. Install closet shelving/closet rod as necessary 4. Install interior handrail in stairwell of unit if needed 5. Final Cleaning of Entire Unit to Make Ready for Occupancy. 6. Contractor is to provide all materials 7. Power wash exterior if needed 8. Repair exterior concrete repairs if needed 9. Replace all angle stops and water shut off valves 10. Replace gas shut off valves Bathrooms: 1. Install Vanity Cabinet w/ Vanity Bowl and faucet delta faucet only 2. Supply and install One (1) new 16-inch elongated toilet and seat 3. Install New Medicine Cabinet with Mirror 4. Install all new bathroom Accessories, Non-UFAS 5. Remove and install new tub, shower wall, faucet and showerhead 6. Install ceramic flooring 7. Replace angle stops 8. Seal all plumbing penetrated areas Kitchen: 1. Replace damaged or worn cabinetry with HUD Severe Use base and wall Magnolia Cabinets 2. Install Postformed Wilsonart Black Granite Laminate countertops 3. Install Broan #4100 range hood (Black) 4. Supply and install single bowl stainless steel kitchen sink and faucet delta faucet only 5. Install GFI above kitchen sink 6. Install receptacle behind stove 7. Replace angle stops 8. Seal all plumbing penetrated areas 9. Install rat guard behind base cabinets, stove and refrigerator inspection needed when done Mechanical / Plumbing: 1. Check and Inspect Gas Distribution (Stove) for service and repair any leaks. 2. Water Distribution (Bathroom & Kitchen) for leaks, repair leaks throughout whole unit 3. Inspect and Repair (if necessary) Drain, Water & Vent (Bathroom and Kitchen, toilets) 4. Replace all convectors secure to wall 6. Delta Faucets Only for all faucet fixtures Electrical: 1. Replace all Switches / Receptacles and metal cover plates. 2. Replace existing raceways and install new raceways through out entire unit 2. Check Electric Service Panel for Gaps/Missing Breakers/Doors. 3. Replace all light fixtures with LED integrated light fixtures. 4. Install 10 yr sealed smoke detectors in every bedroom BRK Smoke Detector 5. Install combination smoke / carbon monixide detectors on 1 st and 2 nd Floor common areas Doors & Windows: 1. Replace all interior doors with solid wood doors 2. Supply and install vertical blinds in all windows 3. Clean all window wells and seals (Lead Testing) 4. Repair or Replace windows through out unit if needed 5. Replace Front and Rear Exterior Door 6. Replace Door Sweep and Weatherstipping Painting/Drywall Repair: 1. Supply all materials to Paint the Entire Units to Include: o Walls and ceilings shall be painted with two finish coats eggshell latex. o Kitchen and bathroom walls & ceilings, and all doors, shall receive a semi-gloss final finish coat. o Exterior door and frame, porch front and exterior railing shall be painted (Lead Testing) o The Contractor shall be responsible for all drywall repairs, point-up and resulting painting required, ensuring a high-quality finish that is acceptable to the HABC Housing Management. o Paint shall be Sherwin Williams "Pro-Mar 200" in HABC Antique White color (or brand of equal color, finish, durability, etc.). o The Contractor shall follow United States Environmental Protection Agency (EPA) Lead-Based Paint Renovation, Repair and Painting (RRP) Program Rules. Flooring: 1. Supply and install lifeproof Rigid Core Luxury Vinyl Flooring throughout entire unit 2. All floors must be level before applying flooring... 3. Replace all treads and risers 4. Supply and install 4" Baseboard with Quarter Inch Round shoe molding and caulk as needed throughout unit.
Award
Residential Subdivision
$93,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 6, 2025
November 5, 2025
Multiple Locations, Baltimore, MD
Related To This Project
Baltimore, MD
Bid Date: Nov 12 2021
Baltimore, MD
Bid Date: May 17 2021
Baltimore, MD
Bid Date: Oct 29 2021
Baltimore, MD
Bid Date: Aug 11 2021
Baltimore, MD
Bid Date: Sep 17 2020
Baltimore, MD
Bid Date: Oct 29 2020
Baltimore, MD
Bid Date: Jan 06 2021
Baltimore, MD
Bid Date: Sep 17 2020
Baltimore, MD
--
Baltimore, MD
Bid Date: Oct 24 2025
Baltimore, MD
Bid Date: Dec 17 2025
Baltimore, MD
Bid Date: Nov 05 2025
Baltimore, MD
Bid Date: Oct 17 2025
Baltimore, MD
Bid Date: Sep 22 2025
Baltimore, MD
Bid Date: Nov 06 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.