BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 24, 2025 at 8:00 PM

Updated October 25, 2025

Site work and paving for a sidewalk / parking lot in Burlington, North Carolina. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Reference Number 0000399366 The Project Description is as follows: The work area is located on S. Beaumont Ave. between N. Church St. and Bowman Ave. Approximately 100-SY of concrete sidewalk, including ADA ramps, and 200-LF combined of varying types of curbing and curb and gutter. Miscellaneous stone, grading, asphalt paving, site restoration and seeding. Traffic Control per City of Burlington standard specifications and details. This project is funded by CDBG funds. Bid Intent Optional Bid Intent Deadline 10/14/2025 01:00 PM EDT Question Deadline 10/17/2025 at 5:00 PM ET Questions are submitted online Yes General Requirements - Bid Deposit Required - Certified Payroll - Contractors License Required - Federally Funded - Installation Required - Insurance Required - Prevailing Wage Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % No Bid shall be considered or accepted unless at the time of its filing the same shall be accompanied by a deposit of a certified or cashier's check drawn on a bank or trust company insured by the Federal Deposit Insurance Corporation (FDIC), in an amount equal to five percent (5%) of the amount of the Bid. The check shall be made payable to City of Burlington. Said deposit shall guarantee that the Contract will be entered into by the successful Bidder if the Award is made. Such deposit of certified or cashier's check may be held by City of Burlington until the successful Bidder has executed and delivered the Contract Documents, including performance and payment bond, to City of Burlington and returned or kept in accordance with North Carolina General Statute 143-129. In lieu of the certified or cashier's check deposit mentioned above, the Bidder may file a Bid Bond in the same amount executed by a corporate surety authorized to execute such bonds in North Carolina . City of Burlington requires the Project to be at Substantial Completion by December 15, 2025 and Final Completion by December 31, 2025. Notice To Proceed (NTP) is anticipated to be issued by November 1, 2025. Bids shall be submitted under a condition of irrevocability, except as required by law, for a period of or one hundred twenty (120) calendar days after the Bid opening. City of Burlington reserves the right to accept or reject any or all Bids, to waive any and all informalities, and to disregard all nonconforming or conditional Bids or counter Bids, and to accept the Bid that will be in the best interest of City of Burlington. Question Deadline 10/03/2025 at 5:00 PM ET Questions are submitted online Yes Bidders are to submit questions via email to Brad Barber at engrdept@burlingtonnc.gov

Bid Results

Sidewalks / Parking Lot

$70,340.00

Public - City

Paving, Site Work

4

10

2

8

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
247
Active Projects
142
Bidding Soon
1,845
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 22, 2025

November 1, 2025

Project location map

Beaumont Ave, Burlington, NC


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.