BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 31, 2025 at 8:00 PM

Updated November 1, 2025

Site work for a water / sewer project in Pittsburgh, Pennsylvania. Completed plans call for site work for a water / sewer project.

Pittsburgh Water is requesting bids for large diameter sewer rehabilitation at two project locations: 1. Birmingham Bridge (M-19) - Located between Fifth Avenue and Second Avenue adjacent to and under the Birmingham Bridge in the Uptown neighborhood. This site consists of the rehabilitation of approximately 670-feet of 60 to 96-inch combined sewer and structures. 2. Frick Park (M-47) - Located in Frick Park under the Forbes Avenue Bridge, aka. Fern Hollow Bridge, in the Squirrel Hill neighborhood. The site consists of the rehabilitation of approximately 1,050-feet of 54 to 60-inch combined sewer and structures. PENNVEST funding requirements will apply to the project. This project is being federally funded by EPA financial assistance dollars and therefore requires all contractors to demonstrate compliance with federal Executive Orders 11625, 12138, and 12432 and EPA Regulations at 40 CFR Part 33, through the detailed documentation of solicitation of Disadvantage Business Enterprises (DBEs). Contractors must demonstrate the Six Good Faith Efforts to identify and solicit DBE firms that are potential sources for any procurement action in the areas of project construction, equipment, services, and supplies by including state qualified small businesses, and minority and women owned business enterprises in the bidding process. Questions Due Date: Oct 21 th 2025, 4:00 PM EDT 1 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer the Procurement Office in writing. Interpretations or clarifications considered necessary by the Procurement Office in response to such questions will be issued by Addenda delivered to all parties recorded as having received the Bidding Documents. Questions received less than seven (7) days prior to the date for opening of Bids may not be answered. Pittsburgh Water is requesting bids for large diameter sewer rehabilitation at two project locations: 1. Birmingham Bridge (M-19) - Located between Fifth Avenue and Second Avenue adjacent to and under the Birmingham Bridge in the Uptown neighborhood. This site consists of the rehabilitation of approximately 670-feet of 60 to 96-inch combined sewer and structures. 2. Frick Park (M-47) - Located in Frick Park under the Forbes Avenue Bridge, aka. Fern Hollow Bridge, in the Squirrel Hill neighborhood. The site consists of the rehabilitation of approximately 1,050-feet of 54 to 60-inch combined sewer and structures. participation is between ten percent (10%) to twenty-five percent (25%) of the total dollar value of the Authority's contract

Bid Results

Water / Sewer

$1,478,209.00

Public - City

Site Work

3

17

50

7

Subscribe For Documents

61 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
209
Active Projects
114
Bidding Soon
1,768
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 30, 2025

February 18, 2026

Project location map

Multiple Locations, Pittsburgh, PA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.