BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 22, 2025 at 8:00 PM

Updated October 23, 2025

Renovation of a religious / funeral development in Natuashish, Newfoundland. Completed plans call for the renovation of a religious / funeral development.

Closing Time: 4:30 PM (NT) ** Please note that there has been 3 addendum issued for this project. ** Question Acceptance Deadline 2025/10/15 12:30:00 PM NDT Construction Renovations and Upgrades at the Mushuau Innu First Nation Church Located in Natuashish, Newfoundland and Labrador. .1 Work of this Contract comprises general construction renovation of the Tshukuminu St.Ann's Church, located at 1 Pasteen St, Natuashish, NL; and further identified as MIFN Church. The interior work is to be ongoing throughout the fall and winter. Exterior work to take place in spring and summer 2026 with project substantial completion August 15 2026. The projects' overall goal is to renovate and repair the 550 m2 church. This work includes: Demolition (Level 1): a. Remove all existing windows including, window treatment (blinds, etc.), window boxes, ledges, and trim. b. Remove existing washroom fixtures, vanity, mirror, and washroom accessories. c. Remove existing floor finishes and base trims throughout building down to sub floor or conc. d. Remove all existing rubber stair treads/risers and railing. e. Remove all existing interior, c/w hardware, trims, jambs, boxes etc. f. Remove existing fuel oil tank, stand, lines in its entirety. g. Remove all existing chimneys, pipe, flues, caps, guys associated with wood and oil heating sources. h. Remove all existing interior lighting fixtures, receptacles, switches, cover plates, main level. (Boxes to remain). i. Remove all millwork, cabinets, counters, appliances, fixtures etc. in existing kitchens and washrooms. j. Remove all drop ceiling grid and tile. k. Temporarily remove/relocate and or store all furnishings, pews, alters, equipment etc. to allow completion of new work. I. Remove existing hrv unit c/w associated duct, fittings, grills, diffusers. m. Remove all fire/life safety devices, fixtures, sensors etc. Demolition (Level 2): a. Remove all existing sealed window glazing units. b. Remove existing washroom fixtures, vanity, mirror, and washroom accessories, speedways etc. c. Remove existing floor finishes and base trims throughout building down to sub floor or conc. d. Remove all existing rubber stair treads/risers and railing. e. Remove all existing interior doors, c/w hardware, trims, jambs, boxes etc. f. Remove all existing chimneys, pipe, flues, caps, guys associated with wood and oil heating sources. g. Remove all existing interior lighting fixtures, receptacles, switches, cover plates, throughout second level. (Boxes to remain). h. Remove all millwork, cabinets, counters, appliances, fixtures etc. in existing kitchens. i. Remove all drop ceiling grid and tile. J. Temporarily remove/relocate and or store all furnishings, equipment etc. to allow completion of new work. k. Remove existing washer/dryer. 1. Remove existing hrv unit c/w associated duct, fittings, grills, diffusers. m. Remove all fire/life safety devices, fixtures, sensors etc. Demolition (Exterior): a. Remove all existing sealed window glazing units. b. Remove existing floor finishes and base trims throughout building down to sub floor or conc. c. Remove all existing chimneys, pipe, flues, caps, guys associated with wood and oil heating sources. d. Remove existing metal fascia at roofs, eaves, throughout. e. Remove existing roofing shingles, and related roofing materials down to existing roof sheathing. f. Remove all existing exterior lighting fixtures, receptacles, switches, cover plates. g. Remove existing exterior concrete pads, landings at all exit locations. h. Remove organic materials min. 1.0m from perimeter of building, ie. grass, sod, rocks, etc. i. Remove all existing exterior hoods, vents, grills, exposed cables. j. Remove existing siding material 305mm up wall face for installation of new flashing and waterproofing at wall/roof intersection. k. Remove cracked or rotten wood siding or trims, assume min. 30m of trims and 10sq/m of siding. Renovation (Level 1): a. Install new laminate flooring with required accessories, transitions, adhesives, and levelers as required to perform the work. b. Install new windows, window boxes, ledges, trim, and treatments (blinds, etc.). c. Install new washroom fixtures including toilet, basin, vanity, tub/shower, and washroom accessories. d. Install new top and bottom kitchen cabinets, countertops, sinks, trims, and hardware in existing kitchen. e. Install new appliances. f. Install new wood baseboards and door/window casings. g. Install new interior doors with jambs, boxes, facings, hinges, locksets, passage sets, closures, stops, auto openers, etc. h. Install new stair handrail, rubber stair treads & risers. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Post-Bid

Religious / Funeral

Public - Federal

Renovation

45

20

6

Subscribe For Documents

47 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1
Active Projects
0
Bidding Soon
5
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 22, 2025

November 10, 2025

Project location map

To Be Determined, Natuashish, NL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.