BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 25, 2025 at 8:00 PM

Updated September 26, 2025

This is a service / maintenance or supply contract in Pittsburgh, Pennsylvania. Contact the soliciting agency for additional information.

Initiating Organization: Engineering District 11-0 Status: Published Show Published Advertisement Agreement Type: Project Specific 100% State Funded: No Services Requested: Construction Inspection This advertisement is being republished with a DBE goal for the agreement of 15%. The SOI Deadline date is now 10/2/2025. The Department of Transportation will retain an engineering firm to provide supplementary construction inspection staff of approximately 4 inspectors under the 1100 Inspector-in-Charge, for construction inspection and documentation services on the following project(s): The Department will establish an order of ranking of a minimum of (3 ) firms for the purpose of negotiating an agreement based on the Department's evaluation of the statements of interest received in response to this solicitation. The final ranking will be established directly from the statements of interest. Technical proposals will not be requested prior to the establishment of the final ranking. The qualifications and experience required of the firm's inspectors will be established by the Department, and the qualifications of the firm's proposed employees will be reviewed and approved by the Department. It is anticipated that a supplementary construction inspection staff for this assignment will consist of the following number of inspectors who meet the requirements for the inspection classifications as detailed in the General Requirements and any additional requirements set forth in this advertisement. The classifications of TCIS, TCI and TA have been amended to identify multiple levels of compensation based on experience and training. Please refer to the General Requirements for the changes. For these three classifications, the submitting firm may propose either a TCIS-1 or 2 for each TCIS required, either a TCI-1, 2, or 3 for each TCI required and either a TA-1 or 2 for each TA required. The maximum hourly rate for each of these sub-classifications is stated later in this advertisement. The Maximum Straight Time Hourly Payroll Rate shown in the following table is the maximum rate for the highest sub-classification. All questions and answers are required to go through ECMS's "Questions and Responses" forum. The statement of interest, at a minimum, should indicate how the selected firm will accomplish the tasks outlined and provide the services as detailed. The anticipated duration of the agreement is 2 years. The goal for Disadvantaged Business Enterprise (DBE) participation in this agreement shall be 15 % of the total agreement cost. Cost included in a DBE firm's price proposal as direct cost of work and services by others shall not count as DBE participation in this agreement, unless completed by a DBE firm. Additional information concerning DBE participation in this agreement is contained in the General Requirements and Information Section referenced below. The method of contractor selection has not been determined at this time. PA DOT - RFQ - Construction Inspection & Management for Jacks Run Bridge No. 3

Conceptual

Bridges / Tunnels

Public - State/Provincial

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
215
Active Projects
116
Bidding Soon
1,843
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 20, 2026

Project location map

I-279, Pittsburgh, PA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.