BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 11, 2025 at 7:00 PM

Updated November 15, 2025

Site work and new construction of a transportation facility in Mobile, Alabama. Completed plans call for the construction of a one-story above grade transportation facility; and 140,000-square-foot, one-story above grade transportation facility.

Mobile International Airport Terminal and Central Utility Plant Completion Project The work consists of the interior fit-out of a 140,000 SF terminal building, including interior framing, MEP (mechanical, electrical, and plumbing), and finish work. It also includes completion of apron level construction with masonry, framing, basic finishes, MEP systems, and minor structural modifications. Terminal completion includes installation of exterior façade finishes, mainly Exterior Insulation and Finish Systems. The Central Utility Plant work includes installation of all equipment, piping, electrical, and HVAC work necessary to complete the plant, as well as installation of hydronic piping between the plant and other airport buildings. Some work is within the Air Operation Area, with special safety and security conditions and a construction-phasing schedule to minimize airport user inconvenience. Each bidder must submit evidence of competency and financial responsibility using the Statement of the Bidder included in the contract documents. Bidders must register and obtain plans and specifications online, submit sealed bids in triplicate on the provided forms, and provide a certified check or bid bond for 5% of the bid. All federal regulations, EEO requirements, DBE requirements, and Buy American compliance apply. Bidders are required to make good faith efforts to subcontract 9% of the contract value to small businesses owned and controlled by socially and economically disadvantaged individuals. The Mobile Airport Authority reserves the right to reject any and all bids and to waive informalities. Question Deadline 10/10/2025 at 5:00 PM CT All questions/concerns shall be addressed in writing and in accordance with the specified requirements to: Jeff Buckner - jbuckner@jescoinc.net Ben Williams - bdwilliams@jescoinc.net

Post-Bid

Transportation Terminals

$90,000,000.00

Public - City

New Construction, Site Work

80

14

51

6

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
13
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 6, 2025

December 17, 2025

Project location map

2455 Michigan Ave, Mobile, AL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.