Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 16, 2025 at 8:00 PM
Updated October 17, 2025
Site work for a playground / park / athletic field in Orland Park, Illinois. Completed plans call for site work for a playground / park / athletic field.
Reference Number 0000398865 Question Deadline 10/07/2025 at 12:00 PM CT Questions are submitted online Yes The Village of Orland Park ("Village") is requesting proposals for crack filling, repair and color coating (RCC), asphalt repair or overlay, and fencing repair at Eagle Ridge Park located at 10755 Eagle Ridge Dr. Orland Park, IL. and at Discovery Park located at 11501 Brook Hill Dr. Orland Park, IL 60462 ("Project"). The work to be performed by the successful proposer shall be complete on or before July 1st , 2026. General Requirements - Insurance Required - Prevailing Wage Required Bonding Requirements - Bid Bond 10 % - Performance Bond 100 % - Payment Bond 100 % This project includes structural crack repair, asphalt resurfacing, acrylic color coating, basketball court layout and markings, and installation of new basketball equipment. The work also includes site adjustments to stormwater grates and potential minor excavation for posts, ensuring a safe, playable, and long-lasting court surface. Scope of Work 1. Crack Repair & Surface Preparation Mechanically rout, clean, and fill cracks less than 0.75". 2. Asphalt Paving, Grinding & Leveling Surface Evaluation: Inspect the entire court surface for uneven areas or structural deficiencies. Grinding & Overlay (If Needed): Where significant heaves, low spots, or deteriorated asphalt are identified, grind the affected areas and apply an asphalt overlay to achieve a stable, uniform base. Furnish, install, and compact a 2" N-50 hot-mix asphalt (HMA) surface course for slope correction and final playing surface. Apply SS-1h asphalt tacking primer as required. 3. Acrylic Surfacing Apply a base coat of acrylic resurfacer to uncoated asphalt. Apply a top coat of acrylic resurfacer. Apply two coats of textured acrylic color (one base color) plus additional accent color as directed. 4. Court Layout & Markings Layout, mask, prime, and stripe regulation basketball court lines with textured line paint. 5. Basketball Equipment Installation Remove existing concrete footings for net posts/basketball goals. Excavate and set new basketball anchor bolts or posts in concrete as required (equipment supplied separately). Furnish and install a 5' gooseneck basketball goal with fan-shaped backboard and rim, ensuring proper alignment and secure installation. 6. Site Adjustments & Cleanup Ensure stormwater grates are reset to proper industry-standard grade. Haul away and dispose of approximately 1 cubic yard of soil, gravel, or clay. Remove all construction debris and restore any disturbed areas to original condition.
Post-Bid
Playgrounds / Parks / Athletic Fields
$30,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 15, 2025
November 14, 2025
Discovery Park 11501 Brook Hill Drive, Orland Park, IL
Related To This Project
Orland Park, IL
--
Orland Park, IL
Bid Date: Oct 23 2025
Orland Park, IL
Bid Date: Nov 13 2025
Orland Park, IL
Bid Date: Oct 24 2025
Orland Park, IL
--
Orland Park, IL
Bid Date: Dec 02 2025
Orland Park, IL
Bid Date: Apr 29 2021
Orland Park, IL
Bid Date: Oct 10 2025
Orland Park, IL
Bid Date: Oct 02 2025
Orland Park, IL
Bid Date: Oct 08 2025
Orland Park, IL
Bid Date: Sep 08 2025
Orland Park, IL
Bid Date: Sep 11 2025
Orland Park, IL
Bid Date: Sep 03 2025
Orland Park, IL
Bid Date: Jul 29 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
