BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 9, 2025 at 8:00 PM

Updated November 6, 2025

Site work, paving and outdoor lighting for a mixed-use development in Morton, Illinois. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

City/County Morton Earth Excavation 1,175 Cy; Rem & Disp Uns Matl 118 Cy; Trench Backfill 37 Cy; Geotech Fab F/gr Stab 2,661 Sy; Topsoil F & P 4" 2,083 Sy; Seeding Cl 1a 0.50 Ac; Mulch Method 2 0.50 Ac; Perimeter Eros Bar 368 Ft; Sub Gran Mat a 4" 2,168 Sy; Sub Gran Mat a 12" 493 Sy; Agg Base Cse B 242 Ton; Pcc Bse Cse 8 1,162 Sy; P Hma Bc Il19.0 N70 147 Ton; P Hma Sc Il-9.5 D N70 575 Ton; Pcc Pvt 10 Jointed 787 Sy; Pavement Rem 814 Sy; Hma Surf Rem 1 3/4 4,700 Sy; Comb Curb Gutter Rem 1,924 Ft; Storm Sew Cl a 1 12" 221 Ft; Storm Sewer Rem 12" 284 Ft; Man Ta 5 Dia T8g 1 Ea; Remov Inlets 14 Ea; Comb Cc&g Tb6.12 564 Ft; Comb Cc&g Ty B-6.24 1,138 Ft; Non Spl Waste Disposl 230 Cy; Mobilization 1 Ls; Elect Serv Install 1 Ea; Lt P Gs 35mh 15ma 14 Ea; Light Pole Fdn 24d 77 Ft; Ts Post Galvs 15 1 Ea; Ts Post Galvs 16 1 Ea; Stl Comb Maa&p 34 1 Ea; Stl Comb Maa&p 45 1 Ea; Stl Comb Maa&p 48 1 Ea; Stl Comb Maa&p 52 1 Ea; Stl Comb Maa&p 54 1 Ea; S C Maa&p Dma 46 & 50 1 Ea; Inlets Tg-1 Dbl 1 Ea; Inlets Tg-1 1 Ea; Inlets Tg-1 Spl 1 Ea; Traf Cont & Prot Spl 1 Ls; Construction Layout 1 Ls; Detour Signing 1 Ls Project Location: IL 98 intersections at Flint Avenue and Erie Avenue in the Village of Morton Proposals requiring prequalification of bidders will be issued only to those contractors who are qualified with the Department of Transportation. Prequalification forms may be secured from the Engineer of Construction, Administration Building, 2300 South Dirksen Parkway, Springfield, IL 62764. ILDOT - Earth Excavation, Comb Curb Gutter Rem, Storm Sewer Rem

Post-Bid

Roads / Highways

$500,000.00

Public - City

Outdoor Lighting, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
133
Active Projects
78
Bidding Soon
1,212
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 9, 2025

November 7, 2025

Project location map

IL-98, Morton, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.