Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 12, 2025 at 7:00 PM
Updated November 13, 2025
Demolition, site work, new construction, renovation and addition to a municipal facility in Raymore, Missouri. Conceptual plans call for the addition of a 4,000-square-foot municipal facility; for the demolition of a municipal facility; for the construction of a municipal facility; for the renovation of a municipal facility; and for site work for a municipal facility.
As of November 12, 2025, per owner, they have not selected and awarded a design team yet. It is slated to be part of new business for their November 20th Board of Directors meeting. However, they have shortlisted 2 firms. Once the Construction Manager and Design Firm are awarded, they intend to move as quickly as possible. They hope to be at a point of scraping ground in May 2026 with completion by May 2027. The South Metropolitan Fire Protection District (Fire District) requests qualifications and proposals for Construction Manager at Risk (CMaR) firms for the construction of an expansion to our Administrative Headquarters. Upon completion of a review of proposals received, the Fire District anticipates awarding a contract for pre-construction services, and at the Fire District's discretion, a subsequent contract for the construction of the facility. The South Metro Fire Protection District (Fire District) requests proposals for architecture services for the necessary expansion of their program and facilities. Expansion needs include renovation and/or additions to an existing administrative headquarters facility. This project is expected to occur within the next calendar year. The Fire District is seeking an Architect that can take the concept from its existing preliminary framework through finished products, including programming, design development, prototyping, construction documents, permitting, fabrication, delivery, and installation. For additional information or to obtain the entire RFQ/P, please contact Deputy Chief Eric Smith at esmith@southmetrofire.org or 816-331-3008 during normal business hours. The method of Contractor Selection has not been Determined at this time.
Conceptual
Municipal
$4,000,000.00
Public - City
Addition, Demolition, New Construction, Renovation, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 1, 2026
611 W Foxwood Dr, Raymore, MO
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
