BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 5, 2025 at 7:00 PM

Updated November 6, 2025

Site work and paving for a road / highway in Morrisonville, New York. Completed plans call for site work for a road / highway; and for paving for a road / highway.

**As of November 4th, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** The Town of Schuyler Falls is accepting bids for the 2026 Pavement Project in the village of Morrisonville NY. Any clarification or questions, please contact Darren Seymour, Town of Schuyler Falls Highway Superintendent. 518 5690011. The following roads are to be ground 4" deep from curb to curb and repavedwith 2" ofT6 top after compactions. All drainage catch basins, manholes, and water valves / shutoffs need to be adjusted to the proper height for new pavement height. 1. Mason ST from 22B to Rickson Ave (ground & paved) 2. Mason St from Rickson Ave to Broadwell RD just 2" of overlay 3. River ST (ground & paved) 4. Emory ST (ground & paved) 5. Maple ST (ground & paved) 6. Church ST (ground & paved) 7. Dare ST (ground & paved) Mason ST from River ST to 1065 Mason ST needs the grinding and road to be pitched so all water runs to the east side of the street.

Bid Results

Roads / Highways

$472,500.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
604
Active Projects
300
Bidding Soon
2,700
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 28, 2025

July 15, 2026

Project location map

Multiple Locations, Morrisonville, NY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.