Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 14, 2025 at 7:00 PM
Updated November 15, 2025
Site work for a water / sewer project in Auburn, Alabama. Completed plans call for site work for a one-story above grade water / sewer project.
The City of Auburn, Alabama is seeking bids for the Miscellaneous Pump Station Improvements Project according to provided specifications. All bidders must possess an Alabama general contractor's license to qualify. Bidders must register in the City's Vendor Self Service (VSS) system and add the appropriate NIGP commodity codes to receive bid notifications. Specifications and instructions can be obtained electronically upon request or through the City's Procurement website. Question Deadline 10/27/2025 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Questions received less than 3 days prior to the date for opening of Bids may not be answered. Questions concerning insurance coverage may be directed to the Risk Manager, McCarthy Autry at 334.501.7247. The Project consists of the following major components: o Replacement of existing Woodland Park #1, Woodland Park #2, and Choctafaula Pump Station wet well submersible pumps with new wet well submersible pumps. o Replacement of existing submersible pump rails and base elbow at Woodland Park #1, Woodland Park #2, Highlands, and Choctafaula Pump Stations. o Replacement of existing discharge piping, valves, and supports in wet well and valve pit at Woodland Park #1, Woodland Park #2, Highlands, and The Preserve Pump Stations. o Replacement of existing wet well piping at Graystone and Stone Creek Pump Stations. o Replacement of existing submersible pump rails at Stone Creek Pump Station. o Rehabilitation of wet well, including removal of existing coating and deteriorated concrete and application of new corrosion resistant coating at Woodland Park #1, Woodland Park #2, The Preserve, and Graystone Pump Stations. o Installation of fencing around Woodland Park #1 Pump Station. o Installation of lighting at Woodland Park #1, Woodland Park #2, The Preserve, and Stone Creek Pump Stations. o Installation of water line at Woodland Park #1 Pump Station. o Installation of spigot at Highlands Pump Station. o Replacement of existing pump control panel, including all internal wiring, terminal strips, control relays, and electronic devices at Woodland Park #1, Woodland Park #2, and Graystone Pump Stations. o Retrofit of existing pump control panel, including all internal wiring, terminal strips, control relays, and electronic devices at The Preserve Pump Station. o Removal of ladder rungs in Graystone Pump Station wet well. o Installation of new wet well cover, including fall protection grating, at Graystone Pump Station. o Installation of new flow meter on Choctafaula Pump Station effluent force main. o Installation of new diesel driven standby pump at Choctafaula Pump Station. The Work will be completed in all respects within 300 calendar days from the date when the Contract Times commence to run. Questions concerning insurance coverage may be directed to the Risk Manager, McCarthy Autry at 334.501.7247.
Bid Results
Water / Sewer
$3,167,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 13, 2025
December 29, 2025
144 Tichenor Ave, Auburn, AL
Related To This Project
Auburn, AL
--
Auburn, AL
Bid Date: Oct 23 2025
Auburn, AL
Bid Date: Nov 03 2025
Auburn, AL
Bid Date: Oct 09 2025
Auburn, AL
--
Auburn, AL
Bid Date: Nov 06 2025
Auburn, AL
Bid Date: Oct 10 2025
Auburn, AL
Bid Date: Nov 14 2025
Auburn, AL
Bid Date: Sep 25 2025
Auburn, AL
Bid Date: Sep 25 2025
Auburn, AL
Bid Date: Sep 11 2025
Auburn, AL
Bid Date: Sep 25 2025
Auburn, AL
Bid Date: Sep 18 2025
Auburn, AL
Bid Date: Sep 23 2025
Auburn, AL
Bid Date: Sep 25 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
