BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 1, 2025 at 8:00 PM

Updated October 2, 2025

Site work and paving for a mixed-use development in Sterling, Virginia. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

This project provides for the design, right-of-way acquisition, and construction of 0.68 miles of sidewalk and shared-use path along the south side of Sterling Boulevard from Shaw Road to Davis Drive. The project includes new or upgraded ADA-compliant pedestrian ramps at three intersections, as required. This project was prioritized as a part of the 2020 Sidewalk and Trail Prioritization Study. The project is ranked as priority #18 in the Sidewalks and Trails Program. The project is included in the County's 2025-2030 Capital Improvement Program (CIP). As of October 1, 2025, project is in planning. Design FY2025-2026. Construction FY2029-2030. Completion FY2030. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$3,675,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
122
Active Projects
3
Bidding Soon
1,615
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 31, 2028

Project location map

Sterling Blvd, Sterling, VA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.