BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 12, 2025 at 7:00 PM

Updated November 13, 2025

Remodeling of a multi-residential development in Los Angeles, California. Completed plans call for the remodel of a one-story above grade multi-residential development.

The Housing Authority of the City of Los Angeles invites contractors to submit firm fixed-price sealed bids for as-needed Bathtub, Sink, Countertop, and Backsplash Refinishing and Repair Services. The scope of work includes providing these services on an as-needed basis. Contractors must access the bid package, including plans and specifications, from the Regional Alliance Marketplace for Procurement (RAMP) at www.rampla.org. Registration on RAMP is required to receive notifications about any addenda. Sealed bids must be submitted to the central business office at 2600 Wilshire Boulevard, Los Angeles, California. General Requirements 1. The Contractor shall have a valid C-61 Specialty with D-12 Synthetic Products Contractor license and in good standing from the State of California's Contractor Licensing Board at the time of bid submission and through the end of the contract term. Contractor shall also comply with all applicable federal,state and local laws,rules,regulations, ordinances and codes and obtain any licenses or permits required to provide the services under this QSP. 2. All services and goods provided shall be covered by the most favorable commercial warranties given to any customer for same or similarsupplies or services, but such goods and services shall be warranted for at least a period of two (2) years. 3. All works shall be performed in accordance with acceptable industry standards. All finished products must be free from bubbles, bumps, pitting, peeling, chipping, sharp edges and smears. 4. Upon receipt of a service request, the Contractor shall provide HACLA's authorized representative with a written quote that describes the work to be performed and the estimated cost of the work. The Contractor shall not proceed with work prior to receiving a Purchase Order and to scheduling the work with HACLA's authorized representative. 5. All trash and debris must be removed from the work site at end the work dayGeneral Requirements 1. The Contractor shall have a valid C-61 Specialty with D-12 Synthetic Products Contractor license and in good standing from the State of California's Contractor Licensing Board at the time of bid submission and through the end of the contract term. Contractor shall also comply with all applicable federal,state and local laws,rules,regulations, ordinances and codes and obtain any licenses or permits required to provide the services under this QSP. 2. All services and goods provided shall be covered by the most favorable commercial warranties given to any customer for same or similarsupplies or services, but such goods and services shall be warranted for at least a period of two (2) years. 3. All works shall be performed in accordance with acceptable industry standards. All finished products must be free from bubbles, bumps, pitting, peeling, chipping, sharp edges and smears. 4. Upon receipt of a service request, the Contractor shall provide HACLA's authorized representative with a written quote that describes the work to be performed and the estimated cost of the work. The Contractor shall not proceed with work prior to receiving a Purchase Order and to scheduling the work with HACLA's authorized representative. 5. All trash and debris must be removed from the work site at end the work dayb. Remove all the old caulk that surrounds the bathtub where the bathtub connects to the surrounding walls. c. For bathtubs and kitchen sinks that have been previously re-glazed and are now peeling, surfaces shall be scraped, removed, and clean before re-glazing. d. Clean all dirt, grease, soap scum and other debris from bathtub and sink using trisodium phosphate. e. Sand bathtubs and kitchen sinks to promote better adhesion of the resurfacing chemicals. f. Repair any scratches, chips, burns, or dings. g. Protect faucets, drains and adjacent surfaces from damage, over spraying or staining. h. Resurface the bathtub following the materials manufacturer's instructions and recommendations for use of all chemicals. Product must be spray on type. Roll-on, brush-on, and aerosol can spray type will not be accepted. i. Finish with a coat of non-yellowing top coat. j. Caulk around the kitchen sink and all areas surrounding the bathtub where the bathtub connects to the wall surrounds. 2. Refinish kitchen or bathroom countertops: a. Clean the surface of any dirt, grease, or other debris using trisodium phosphate. Sand the surface for better adhesion; b. Refinish the countertop per the manufacturer's instructions and recommendations for use of all chemicals; and c. Finish with a coat of non-yellowing top coat. 3. Repair and Re-grout Bathtub Wall SurroundKitchen Countertops and/or Backsplashes: a. Clean the surface of any dirt, grease, or other debris using trisodium phosphate. Sand the surface for better adhesion. b. Repair and re-grout bathtub wall surrounds, kitchen countertops and/or backsplashes per the materials manufacturer's instructions and recommendations for use of all chemicals Site Addresses: Site Name Address City ZIP Avalon Gardens 701 E. 88th. Pl. Los Angeles 90002 Estrada Courts 3232 Estrada St. Los Angeles 90023 Imperial Courts 11541 Croesus Ave. Los Angeles 90059 Gonzaque Village 1515 East 105th. St. Los Angeles 90002 Mar Vista Gardens 11965 Allin St. Los Angeles 90230 Nickerson Gardens 1590 114th. St. Los Angeles 90059 Pico/Las Casitas 1526 E. 4th. St. Los Angeles 90033 Pueblo del Rio 1801 E. 53rd. St. Los Angeles 90058 Ramona Gardens 2830 Lancaster Ave Los Angeles 90033 Rancho San Pedro 275 W. First St. Los Angeles 90731 San Fernando Gardens 10995 Lehigh Ave. Los Angeles 91331 William Mead 1300 N. Cardinal St. Los Angeles 90012

Award

Multi-Residential

$599,300.00

Public - City

Remodeling

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
534
Active Projects
255
Bidding Soon
3,707
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 20, 2025

December 19, 2025

Project location map

Multiple Locations, Los Angeles, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.