BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 22, 2025 at 7:00 PM

Updated November 23, 2025

Renovation of a water / sewer project in Burlington, Ontario. Completed plans call for the renovation of a water / sewer project.

The Glen Eden snowmaking water supply system currently consists of a 14-inch intake pipe into Kelso Reservoir feeding a 15-foot wet well, with pumping capacity of approximately 1,600 gpm under a water-taking permit that allows up to 2,400 gpm. To meet future operational needs, Conservation Halton is exploring the feasibility of upgrading the system to enable flows of up to 3,000 gpm, subject to regulatory approval. The project will involve evaluating and upgrading the wet well size, increasing the capacity of the intake system to allow greater water flow into the well, and installing higher-capacity pumps to deliver the required volumes. These improvements are intended to increase pumping capacity during peak cold periods, enhance system reliability by reducing risks such as cavitation, icing, or shutdown, and optimize use of reservoir storage while maintaining compliance with permit conditions and downstream flow requirements. Ultimately, the upgrade will strengthen long-term operational resilience, ensuring Glen Edens snowmaking capacity remains secure under changing climate and weather conditions while supporting consistent, high-quality recreational opportunities and protecting the natural resources of Kelso Reservoir through responsible water management. Documents are available at https://conservationhalton.bidsandtenders.ca/ Question Deadline: Fri Nov 7, 2025 2:00:00 PM (EST) If a Bidder needs to address any discrepancies, errors and/or omissions in the Bid Document, or if they are in doubt as to any part thereof they shall submit questions through Conservation Halton's Bidding System using the "Submit Question" feature associated with the Bid Opportunity. Emailed questions are not permitted and will not be answered.

Post-Bid

Water / Sewer

$200,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
485
Active Projects
268
Bidding Soon
4,944
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 21, 2025

March 30, 2026

Project location map

To Be Determined, Burlington, ON


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.