BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 30, 2025 at 8:00 PM

Updated October 31, 2025

Renovation of a mixed-use development in Washingtonville, New York. Completed plans call for the renovation of a educational facility.

2024 Capital Project Phase 1B - Plumbing Construction (PC) Bidder must provide Bid Security in the amount and form, per the terms indicated in Section Instructions to Bidders. All Bids will remain subject to acceptance for forty-five (45) days following the receipt of Bids. The Owner may, in its sole discretion, reject any Bid and return Bid Security prior to that date. Bids shall not include New York State sales and compensating use taxes on materials and supplies incorporated into the Work, as the Owner being exempt therefrom. Bidders must comply with New York Sate Department of Labor Prevailing Wage Rate Schedule and conditions of employment. The Bidders must comply with New York State Department of Labor Prevailing Wage Rate Schedule and conditions of employment. The Washingtonville Central School District reserves the right to waive any informalities or irregularities in the Bids received, and/ or to reject all Bids without explanation. Project Location: 1. Washingtonville High School: 54 W Main St, Washingtonville, NY 10992 2. Washingtonville Middle School: 38 W Main St, Washingtonville, NY 10992 3. Round Hill Elementary School: 1314 NY-208, Washingtonville, NY 10992 4. Little Britain Elementary School: 1160 Little Britain Rd, New Windsor, NY 12553 5. Taft Elementary School: 20 Toleman Rd, Washingtonville, NY 10992 SED No. 44-01-02-06-0-001-025 SED No. 44-01-02-06-0-002-019 SED No. 44-01-02-06-0-004-022 SED No. 44-01-02-06-0-007-032 SED No. 44-01-02-06-0-008-019 Sitework: Demo, Grading, Site Prep, Drainage, Sidewalks, Fencing, etc. | Asbestos Abatement | Doors: Replace Doors, New Frames, Patch & Repair Frames, New Sills, Brick Molds, Card Readers, Power Access Controls, Door Hardware, etc. | Mechanical Work: Demo, New Hydronic Piping, Curbs, EX Fans, Kitchen Hood/MAUs, Ductwork, Unit Ventilators, Controls, T-stats, etc. | Plumbing: Water Heaters, Sinks, Gas Piping, Dom. Water Piping | Food Service Equipment: Including Food Prep, Cooler & Freezer, Fire Suppression, etc. | Finishes: Flooring, Ceiling Tile, Paint, etc. | Roof: Openings, Patching and Flashing | Etc. 1. 1st Shift Work Hours M-F 7:00AM - 4:30PM | (during off school days and Summer) | Second Shift 3:30pm - 11:00pm (during school days). Contractor will appropriately man the project to avoid Saturday and Overtime hours which result in Owner, Construction Manager and Architect additional costs. 2. Plumbing Work Contractor is notified that phasing may be required, with multiple mobilizations and multiple crews of various subcontractors. 3. In some locations there are plaster ceilings which remain above the Acoustic tile/grid ceiling. Plumbing contractor will cut access holes where necessary to enable install of hangers for piping to structure above. 4. Any Plumbing piping exposed to view in finished spaces will be insulated and enclosed in 14 ga. metal chase (painted) by Plumber Contractor. Cost will be included in base bid. 5. Plumbing Contractor is responsible for all existing slab sawcut, chop out concrete, sub-slab piping work. 6. Plumbing Contractor will re-insulate any existing domestic water elbows and piping which were removed at new work connections. All costs to be included in the Plumbing Contractors base bid. 7. PC is specifically reminded of their responsibilities for clean up as per Section 017423. Maintaining a clean jobsite is considered a safety issue and will be strictly enforced. In addition to daily cleaning, and weekly wet mopping, the contractor is required to hire a professional cleaning company to final clean all areas impacted by the construction. This includes completely cleaning any surfaces/equipment which has been dusted by the construction work. If the contractor does not properly perform this function when directed by the Owner/CM, within 4 hours of being notified the owner will perform the work with others and deduct the cost from the contractor. Question Deadline 10/15/2025 No interpretation of the meaning of the Contract Documents, the existing conditions, or of the scope of Work will be made verbally. Provide every request for such interpretation in writing, addressed to CSArch, Attention: Dion Miller, by e-mail: dmiller@csarchpc.com, with a copy to Arris Contracting, Attention: Michael Carmine, by email: mcarmine@arriscontracting.com. Subject line for email shall read "Washingtonville Central School District Bid Question Project no: 44-01-02-06-0-001-025

Bid Results

Educational

$278,000.00

Public - City

Renovation

367

54

30

4

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
823
Active Projects
430
Bidding Soon
6,598
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 22, 2025

February 2, 2026

Project location map

Multiple Locations, Washingtonville, NY

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.