Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 30, 2025 at 8:00 PM
Updated October 1, 2025
Renovation of an educational facility in North Canton, Ohio. Conceptual plans call for the renovation of a educational facility.
Stark Campus Chiller Plant Replacement The existing chilled water system located in the Campus Center Building at Kent State University Stark is over 20 years old and requires replacement to ensure reliable and efficient cooling for 6 buildings on the Stark Campus. The system contains two (2) 300-ton chillers and one (1) 400-ton chiller, each with an equivalently sized cooling tower, and operates as a Primary/Secondary system. The replacement equipment will be more energy efficient through direct equipment replacements and improved variable-speed pumping, valves and controls to ensure the most cost-effective production and delivery of the chilled water utility. The existing central chilled water equipment is beyond its service life and is increasingly becoming difficult to maintain and source replacement parts, most specifically for the cooling towers. The existing equipment is no longer considered energy efficient and frequently has service reliability issues. The replacement of the central chilled water equipment will improve energy efficiency and savings by not only replacing antiquated equipment but also installing a controls system to more closely control and monitor system function in addition to addressing deferred maintenance associated with an aging system. It is expected that the Central Chiller Plant Replacement project will be phased based on the available capital funding and prioritized against the most critical areas needing replacement in addition to equipment availability and lead times. This project will be funded through a combination of state capital and local funding. Allows zero unit prices and labor No Allows negative unit prices and labor No The method of Contractor Selection has not been Determined at this time.
Conceptual
Educational
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 30, 2026
6000 Frank Ave NW, North Canton, OH
Related To This Project
North Canton, OH
Bid Date: Oct 31 2025
North Canton, OH
Bid Date: Nov 12 2025
North Canton, OH
Bid Date: Nov 05 2025
North Canton, OH
Bid Date: Dec 19 2025
North Canton, OH
Bid Date: Dec 05 2025
North Canton, OH
Bid Date: Dec 19 2025
North Canton, OH
Bid Date: Jan 22 2026
North Canton, OH
Bid Date: Oct 21 2025
North Canton, OH
Bid Date: Jan 30 2019
North Canton, OH
Bid Date: Dec 21 2018
North Canton, OH
Bid Date: Mar 01 2019
North Canton, OH
Bid Date: Jul 13 2020
North Canton, OH
Bid Date: Aug 29 2025
North Canton, OH
Bid Date: Aug 08 2025
North Canton, OH
--
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
