Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 6, 2025 at 7:00 PM

Updated November 7, 2025

Site work for a playground / park / athletic field in Seattle, Washington. Completed plans call for site work for a 32,400-square-foot, one-story above grade playground / park / athletic field.

The scope of the project is to include the removal and disposal/recycling of the existing synthetic turf surfacing. The replacement product system will include installing approximately 32,400SF of new synthetic turf infield surfacing over a supplemental resilient pad, granular cork, and sand infill at Lower Woodland PF #1 Synthetic Turf Replacement. Contract# PRK730300-307, PRK741070-11 Question Deadline 10/15/2025 at 5:00 PM PT

Award

Playgrounds / Parks / Athletic Fields

$405,000.00

Public - City

Site Work

18

19

5

5

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
275
Active Projects
97
Bidding Soon
2,030
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 22, 2025

November 21, 2025

Project location map

5100 Green Lake Way N, Seattle, WA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed