BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 1, 2025 at 8:00 PM

Updated October 2, 2025

Site work and paving for a road / highway in Snoqualmie, Washington. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

This project will construct approximately 1.7-mile segment of the Eastrail non-motorized trail. The project includes the retrofit of two existing bridges. The trail will be paved, ADA accessible, and include lighting. County: King Length : 1.700 Agency: King Co. DOT - Transit Begin Termini : Approx. Coal Creek Parkway End Termini : Approx. I-405 As of September 30 , 2025, the project is in Conceptual status. Anticipated letting Year is 2026. WADOT - Closing the Eastrail I-90 Gap *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$48,939,141.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
276
Active Projects
153
Bidding Soon
1,422
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 3, 2028

Project location map

I-90, Snoqualmie, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.