BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 25, 2025 at 7:00 PM

Updated November 26, 2025

Site work for a civil project in Carroll, Iowa. Completed plans call for site work for a water / sewer project.

Group A: Distribution system improvements, including but not limited to installation of water mains, water services, pressure-reducing valves and vaults, and associated concrete removal and replacement. Group B: Booster pump station improvements at the City-owned property located northwest of the intersection of U.S. Highway 71 and West 20th Street. Work includes building and foundation construction, grading and site work, concrete flatwork, distribution water main connections, electrical, and controls. Group C: Design, foundation, erection, and coating of the proposed water tower at the booster pump station property. Work includes containment, debris cleanup, and removal. Each bidder shall accompany its bid with bid security as defined in lowa Code Section 26.8, as security that the successful bidder will enter into a contract for the work bid upon and will furnish after the award of contracta corporate surety bond, in a form acceptable to the Jurisdiction, for the faithful performance of the contract, in an amount equal to 100% of the amount of the contract. The bidder's security shall be in the amount fixed in the Instructions to Bidders and shall be in the form of a cashier's check or a certified check drawn on an FDIC insured bank in lowa or on an FDIC insured bank chartered under the laws of the United States; or a certified share draft drawn on a credit union in lowa or chartered under the laws of the United States; or a bid bond on the form provided in the contract documents with corporate surety satisfactory to the Jurisdiction. The bid shall contain no condition except as provided in the specifications. The City of Carroll, lowa reserves the right to defer acceptance of any bid for a period of up to sixty (60) calendar days after receipt of bids and no bid may be withdrawn during this period. If requested, the bid security of unsuccessful bidders shall be promptly returned as soon as the successful bidder is determined or within thirty (30) days, whichever is sooner. The Group A contractor shall fully complete the project no later than December 31, 2026. The Group B contractor shall fully complete the project no later than December 31, 2027. The Group C contractor shall fully complete the project no later than December 31, 2027. Should the contractor fail to complete the work in this timeframe, liquidated damages of $1,000 per calendar day will be assessed for work not completed within the designated contract term. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Custom Bid Result. Group A: McCarthy Trenching LLC $1,175,720.60 Group B: Weodler Inc $1,824,000.00 Group C: Caldwell Tanks $1,484,500.00

Award

Water / Sewer

$4,484,221.00

Public - City

Site Work

66

28

30

6

Subscribe For Documents

65 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
189
Active Projects
134
Bidding Soon
1,446
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 13, 2025

January 12, 2026

Project location map

Multiple Locations, Carroll, IA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.