BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 20, 2025 at 8:00 PM

Updated November 14, 2025

Site work, new construction, renovation and addition to a mixed-use development in Boston, Massachusetts. Completed plans call for the addition of a parking garage; for the construction of a parking garage; for the renovation of a parking garage; and for site work for a parking garage.

CM@R Trade Prequalifications. This project reconfigures and consolidates the programs in the North Service Area including: a repurposing through renovation and addition to the existing green bus depot; the construction of a new large vehicle storage and maintenance facility; a new wildlife building; resiliency berm, vehicle service road, relocation of FAA equipment, relocation of fuel station, transfer station, salt shed, sand shed, relocated SIDA wall, expanded switching station, and potential new employee parking garage Specific Scopes of Work include, but not limited to the following: 1. Construction of a ~146,000 sq ft Large Vehicle Maintenance & Storage Facility that will include space for storing and maintaining Massport's largest vehicles such as snow removal equipment and deicing tankers, employee office and work areas, the electrical department, sign shop, carpentry shop, general repair space, central stock room, repair bays for the large vehicles, a new Storm Center, cafeteria and locker / sleeping Bunk Rooms. 2. Repurposing of the Green Bus Depot including renovation and an addition to store some of the large equipment not going into the LVSMF such as the snow melters and storage of seasonal equipment. The repurpose GBD will also include the maintenance and repairs bay for Massport small vehicles. 3. The repurposing of the North Service Area will imply the relocation of several parking spaces used by Massport employees. These parking spaces will be relocated in parking lots in proximity of the new LVSMF and around the Sky Chefs and Gate Gourmet buildings. As the available parking lot area is limited by the reconfiguration of the NSA and the SIDA wall, a new parking structure will be erected between the Sky Chefs and the Gate Gourmet buildings (on the existing Lovell Street laydown area), providing enough parking spaces to match the number of parking spaces relocated from their original locations. 4. A new Salt Shed on the land-side 5. Transfer Station reconfiguration air-side 6. A new sand shed air-side 7. Construction of a new green resiliency berm along the South/East side of the NSA shoreline. The berm is part of the resiliency mitigation strategies within the Boston Metropolitan Coastal Storm Risk Analysis. 8. Construction of a new air-side service road 9. Relocation of the existing fuel station 10. Site and SIDA modifications Question Deadline 10/15/2025 Questions may be sent via email to CPBidQuestions@massport.com

Post-Bid

Parking Garage

$320,000,000.00

Public - State/Provincial

Addition, New Construction, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
668
Active Projects
341
Bidding Soon
3,567
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 13, 2025

July 14, 2026

Project location map

Multiple Locations, Boston, MA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.