BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 19, 2025 at 7:00 PM

Updated December 20, 2025

Demolition, site work, paving, new construction and renovation of a mixed-use development in Huntsville, Alabama. Completed plans call for the construction of a 120,000-square-foot educational facility; and for site work for a educational facility.

Huntsville City Schools Chapman Middle and Magnet School The project calls for the construction of a new middle school facility housing three (3) new schools and all related site work and outdoor facilities. The site includes approximately 30 acres of school land along Reuben Drive in Huntsville, AL. Early site improvements are underway including demolition and removal of a portion of the existing school and tree clearing, required erosion control and site fencing. The building scope Includes a partial two-story academic building including adminstration areas, classrooms, media center, Egaming arena, gymnasium and kitchen/cafeteia. The primary structural system for the facility is steel frame structure with infill materials ranging from masonry, stud walls, curtain wall, and storefront glazing. The scope includes a storm shelter. The new school will be approximately 160,000 square feet distributed throughout the building, which will serve an enrollment capacsty of roughly 900 students. In addition to the core curriculum spaces, there are multiple collaborative spaces, Egaming warm up space, flex labs, a dedicated community space, a full music and arts suite, a competition gymnasium, an Egamang Arena, and a cafeteria and commercial kitchen. All the spaces in the school will be served by both wired and wireless technology as well as the most up to date mechanical and electrical systems. Site work includes several outdoor playgrounds and learning spaces as well as parking lot construction and various plantings and landscaping. Only general contractors who have been approved to bid pursuant to prequalification procedures and criteria established by the Owner will be eligible to bid for the Project A cashier's check or bid bond payable to State of Alabama in an amount not less than five (5) percent of the amount of the bid, but in no event more than $10,000, must accompany the bidder's proposal. Performance and Payment Bonds and evidence of insurance required in the bid documents will be required at the signing of the Contract. The Owner reserves the right to reect any or all proposals and to waive technical errors if, in the Owner's judgement, the best interests of the Owner will thereby be promoted. Contact Raynor Boles and Riley Siniard for prequalification questions at raynor@tcuconsulting.com and riley@tcuconsulting.com.

Award

Educational

$57,964,908.00

Public - City

Demolition, New Construction, Paving, Renovation, Site Work

596

31

597

4

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
0
Bidding Soon
488
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 9, 2025

January 5, 2026

Project location map

2006 Reuben Dr NE, Huntsville, AL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.