BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 30, 2025 at 8:00 PM

Updated October 31, 2025

Site work for a water / sewer project in Braidwood, Illinois. Working plans call for site work for a one-story above grade water / sewer project.

As of 10/30/2025, all bids have been rejected for this project. No additional information is available at this time. The City of Braidwood will receive sealed proposals for improvements related to the Water & Wastewater Treatment Plant Standby Generator Replacement. Proposals must be submitted in sealed envelopes addressed to the City of Braidwood, attention City Clerk, with the name and address of the bidder, as well as the name and number of the project, displayed on the outside. Proposals must be completed on forms provided by the Engineer. A certified check, bank draft, cashier's check, or bid bond payable to the City of Braidwood, in an amount not less than ten percent (10%) of the bid, shall accompany each proposal as a guarantee that, if accepted, a contract will be entered into and the performance properly secured. The successful bidder must furnish a performance bond equal to one hundred percent (100%) of the bid amount for the faithful performance of the contract, with sureties approved by the City Mayor and City Council. All bids must contain an offer to furnish such bond upon acceptance. The right is reserved to reject any or all proposals, to waive technicalities, to postpone the bid opening, or to advertise for new proposals if deemed in the City's best interests. Contractors must pay prevailing wage rates as established by the State of Illinois Department of Labor and comply with all applicable Federal and local regulations. Bidders must have sufficient experience, as determined by the Owner and representatives, with street resurfacing and be IDOT qualified to receive bid documents. If, in the opinion of the Engineer and the City officials, an applicant would not serve the best interest of the City, a proposal will not be issued to that applicant.

Final Planning

Water / Sewer

$7,489,500.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
451
Active Projects
254
Bidding Soon
3,336
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 22, 2025

February 2, 2026

Project location map

141 West Main Street Braidwood Illinois, Braidwood, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.