BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 4, 2025 at 7:00 PM

Updated December 5, 2025

Site work and paving for a bridge / tunnel in Hollister, Missouri. Completed plans call for site work for a one-story above grade bridge / tunnel; and for paving for a bridge / tunnel.

Buffalo Ridge Boulevard - Bridge Repairs General Notice Branson Creek Community Association The Project Includes the Following Work: Repairs to Three (3) Bridge Structures Along Buffalo Ridge Boulevard From Hwy 65 to Branson Airport. Includes Bridge Deck Sealing, Guardrail Repair, Guardrail Height Adjustment, Section Loss Repair and Crack Sealing. Bids Are Requested for the Following Contract: Buffalo Ridge Boulevard - Bridge Repairs / #2025 - 002 Owner Anticipates That the Project's Total Bid Price is Projected to Be in the Range of $400,000 - $450,000. The Project Has an Expected Duration of 45 Days. Notice to Proceed Anticipated March 2026. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The DBEGoal for this project is 0% Question Deadline 11/26/2025 at 5:00 PM CT All questions shall be submitted through online. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than five (5) days prior to the date for opening of Bids may not be answered.

Post-Bid

Bridges / Tunnels

$450,000.00

Public - County

Paving, Site Work

10

10

2

5

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
89
Active Projects
29
Bidding Soon
625
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 3, 2025

March 2, 2026

Project location map

Buffalo Rdg Blvd, Hollister, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.