Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published November 20, 2025 at 7:00 PM
Updated November 21, 2025
Site work and paving for a mixed-use development in Myrtle Beach, South Carolina. Completed plans call for site work for a playground / park / athletic field; for paving for a playground / park / athletic field; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
The City of Myrtle Beach will be receiving Invitation for Bid (IFB) 26-B0010 for Thunderbolt Park Trail. This project consists of the construction of an extension to the existing Thunderbolt Park trail, irrigation installation, water line installation to service new water fountain, driveway installation, and a new parking lot. The proposed project consists of the construction of the Thunderbolt Park Trail extension and a new parking lot for the City of Myrtle Beach, SC. The proposed site is located from 2290 Farrow Parkway up to Emory Road and is sited on three separate parcels including PIN: 44200000022, 44209010002, and 44209010003 totaling 19.99 acres. The proposed site is to connect to the existing Thunderbolt Trail and provide a parking lot for public access. Other site work items include the associated earthwork required, driveway access off Emory Road, a domestic water line to serve a new water fountain, and irrigation services. Also included are two culvert crossings, that shall be provided to allow drivers access to the parking lot from Emory Road and continuous trail access to the existing portion of the Thunderbolt Trail. The culverts are designed to convey a 10-year storm even
Award
Playgrounds / Parks / Athletic Fields
$613,918.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 30, 2025
December 1, 2025
2290 Farrow Pkwy, Myrtle Beach, SC
Related To This Project
Myrtle Beach, SC
--
Myrtle Beach, SC
--
Myrtle Beach, SC
--
Myrtle Beach, SC
--
Myrtle Beach, SC
--
Myrtle Beach, SC
Bid Date: Oct 31 2025
Myrtle Beach, SC
Bid Date: Nov 10 2025
Myrtle Beach, SC
Bid Date: Nov 06 2020
Myrtle Beach, SC
Bid Date: Oct 28 2025
Myrtle Beach, SC
Bid Date: Oct 15 2025
Myrtle Beach, SC
Bid Date: Oct 09 2025
Myrtle Beach, SC
Bid Date: Oct 30 2025
Myrtle Beach, SC
Bid Date: Oct 06 2025
Myrtle Beach, SC
Bid Date: Oct 23 2025
Myrtle Beach, SC
Bid Date: Oct 07 2025
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed